2009 Series Subway Car - Bombardier Transportation -developed Movia family car for the London Underground . The wagon of the 2009 series belongs to wagons of deep-laying lines. The trains of this type of wagons are planned to be put into operation on the Victoria line , to replace the currently operating 1967 series wagons .
| Subway Car Series 2009 | |
|---|---|
| Production | |
| Years of construction | 2007 - present time |
| Country of construction | |
| Manufacturer | Bombardier |
| Compositions built | 47 (December 2011) |
| Technical details | |
| Full capacity | 150 |
| Seats | 32 |
| Car length | 133 m |
| Width | 2.68 m |
| Height | 2.88 m |
| Wagon material | steel |
| Max service speed | 80 km / h |
| Exploitation | |
| Countries of operation | |
| Subway | London |
| Years of operation | since 2009 |
The wagon is fully automatic. The first of the two experimental trains was sent for a run-in to the London Underground in May 2007 , where the train was run-in at night after testing at the company's test site in Derby . This type of train is also used to train and train London Underground drivers.
From July 21 to August 4, 2007, an experimental car was presented at the Euston station for future passengers. The first squad entered the line on July 21, 2009.
In combination with the new signaling system, trains from the cars of this series are characterized by increased reliability and, due to their characteristics, should shorten the passage time between stations. Also, this type of car has a higher capacity, smoother ride, wider doors (which is important when working on the line during rush hours) and greater fitness for disabled people. Each train consists of 8 wagons, has 252 seats and 1,196 standing places.

Salon of the experimental car at the Euston station

Interior of a production car

Experimental train at Euston Station