Banff Trail is a Sea Train station in Calgary . This station opened by 1987 and currently serves 5,600 passengers per day [1] .
| Banff Trail | |
|---|---|
Line 201 | |
| Sea train | |
| opening date | 1987 |
| Type of | ground open station |
| Number of platforms | 2 |
| Type of platforms | twin side |
| Platform Length, m | 75 m |
| Nearby Stations | and |
The station is located near the McMahon Stadium, which accommodates 780 visitors.
As part of the Calgary Transit project, a major overhaul was carried out by the end of 2014, as a result of which the length of the train was increased to 4 cars. Construction took place from 2014 to 2015, during which the station was closed.
Repair was completed on December 21, 2014. The station was equipped with new security cameras, lighting and much more.
In 2005, an average passenger flow of 2900 landings was recorded [2] .
In 2008, the number of visitors to the station increased to 5,600 (weekdays) [3] .
Notes
- ↑ Passenger statistics for Sea Train 2007. Archived on June 8, 2007.
- ↑ Calgary Transit. LRT Station Ridership Neopr (2005). Date of treatment August 24, 2007. Archived on June 8, 2007.
- ↑ Calgary Transit - About CT (Statistics - LRT Ridership) Archived on June 8, 2007.