Ahmedabad Metro - A subway system in the city of Ahmedabad , Gujarat , India.
Content
History
Opened on March 4, 2019 [1] , the first section of line 1 of Vastral Gam-Apparel Park, 6 stations, 6.5 km.
Construction
Construction began in 10 years of the 21st century. 1 line in March 2015, 2 line in January 2016.
Lines
- First / Blue - the first section was opened on March 4, 2019, 6 stations, 6.5 km. Total length 20.5 km
- Second / Red - under construction. The total length of 17.2 km.
Gallery
Links
Notes
- ↑ [1]