GTS Alchevsk Metallurgical Plant

The gas turbine station of the Alchevsk Metallurgical Combine is a thermal gas turbine power plant of the combined cycle of Ekoenergia PJSC (in fact , Alchevsk Metallurgical Combine PJSC ) in the city of Alchevsk . The fuel used is a low-calorie mixture of blast furnace , coke oven and converter gases .

GTS Alchevsk Metallurgical Plant
ukr GTS Alchevsk Metallurgic Combinat
A country Ukraine
LocationLugansk region , Alchevsk
OwnerPrivate JSC "Ekoenergia"
StatusActing
Commissioning2013
Main characteristics
Electric power, MW303
Characteristics of the equipment
Main fuela mixture of blast furnace , coke oven and converter gases
Number of units2
Number and brand of turbinesMitsubishi M701S 2x89.7 MW (gas), 2x61.8 MW (steam)
Number and brand of generatorsMelco ( Japan ) 2х151.5 MW
On the map

According to the project, the capacity should amount to 454.5 MW, which will fully meet the own needs of the metallurgical plant and the adjacent Alchevsk Coke Chemical Plant for electricity consumption, as well as the issue to the unified power grid.

The first stage with a capacity of 303 MW was launched in 2013. The construction of the second stage with a capacity of 151.5 MW was suspended due to armed conflict .

Content

Basic Information

The construction and operation of the power plant is carried out by PJSC "Ekoenergia" of ISD Corporation. GTS is designed according to the scheme of a combined-cycle plant operating in parallel with the integrated power grid. The design capacity is 454.5 MW (3 power units of 151.5 MW each)

The first stage [1] :

  • Unit 1 - launched in March 2013
  • Unit 2 - launched in January 2014

The second stage:

  • Unit 3 - in 2014, construction was frozen due to armed conflict .

Technical specifications of power units

All power units are the same.

The main equipment of the power unit:

  • gas turbine " Mitsubishi " ( Japan ) with a capacity of 89.7 MW
  • steam turbine " Mitsubishi " (Japan) with a capacity of 61.8 MW
  • "Melco" generator (Japan) with a rated capacity of 151.5 MW
  • steam boiler - Nooter / Eriksen utilizer ( USA )
  • gas compressors connected to the steam turbine shaft via a gearbox .

Investments

The total cost of the project is about $ 675 million. [2] Financing is carried out at the expense of own funds of the IUD Corporation, as well as loans from the EBRD and Japan Bank for International Cooperation [3]

Ecology

Thanks to the power plant, carbon emissions should be reduced by 2 million tons. Also, the production of 2.4 billion kWh of electricity produced by the power plant on metallurgical gases, save 1 million tons of coal or 700 million cubic meters of natural gas burned at the thermal power plants of Ukraine to produce the same amount of electricity. [2]

Notes

  1. ↑ PJSC Alchevsk Iron and Steel Works - History
  2. ↑ 1 2 http://www.kmu.gov.ua/control/uk/publish/article?art_id=246457765&cat_id=244277216
  3. ↑ Archived copy (Unsolved) (inaccessible link) . Date of circulation is December 30, 2017. Archived November 4, 2012.
Source - https://ru.wikipedia.org/w/index.php?title=GTS_Alchevskogo_metallurgicheskogo_kombinat&oldid=99261898


More articles:

  • Akhmedov, Zakir Bekir oglu
  • Brother, Sister
  • Last Summer
  • Varfolomeev, Valery Vladimirovich
  • Robert Harris
  • Ozerov, Viktor Alekseevich
  • Verbal names of Russian weapons / F
  • Pavilion № 42 "Livestock" at ENEA
  • Padua from Padua
  • Catalan Renaissance

All articles

Clever Geek | 2019