Vileika hydroelectric power station is a small hydroelectric power station in Belarus , on the river Viliya , at the dam of the Vileika reservoir .
| Vileika hydroelectric station | |
|---|---|
| A country | |
| River | Vilia |
| Owner | Minskvodokanal |
| Status | acting |
| Year of commencement of construction | 1995 |
| Years of input units | 1997-2002 |
| Main characteristics | |
| Annual electricity production, mln kWh | 7.5 |
| Kind of power plant | dam-channel |
| Design head , m | 8.4 |
| Electric power, MW | 2 |
| Equipment specifications | |
| Number and brand of turbines | 4 × GA-8 |
| Power of generators, MW | 4 × 0.5 |
| Main facilities | |
| Dam type | earthen, concrete spillway |
| Dam height, m | five; |
| Dam length, m | 6013; |
| Gateway | not |
| On the map | |
Power 2000 kW. Construction began in 1995, the first phase of the station was commissioned in 1997 , the second phase in 2002 [1] . During the construction of the 1st stage, two GA-8 turbines with a capacity of 500 kW each were installed; during the construction of the 2nd stage, two more GA-8 turbines with a capacity of 500 kW each. The works were performed by Minskvodokanal, Malaya Energetika, Minskvodstroy. During the year, 7.5 million kWh of electricity is generated.
The average difference between the pools is about 8.4 meters. The hydroelectric structure includes an earthen dam with a total length of about 6 kilometers and a maximum height of 5 meters.
It is on the balance sheet of Minskvodokanal .
Notes
- ↑ Vileika mini-hydroelectric power station . INSET. Date of treatment September 5, 2016.