Tauride TPP

Taurida TPP ( Simferopol PSU - TPP ) is a combined cycle power plant in the Crimea . Design capacity - 470 MW [4] . The purpose of the construction is to reduce the load on the transmission networks, which will increase the reliability of the Crimean energy system and reduce the cost of reconstructing power lines . The construction is carried out in the framework of the federal target program "Socio-economic development of the Republic of Crimea and the city of Sevastopol until 2020" [5] .

Tauride TPP
A countryRussia / Ukraine [1]
LocationSimferopol district , Republic of Crimea [2] / Autonomous Republic of Crimea [3]
Statusacting
Commissioning2019
Main characteristics
Electric power, MW470
Equipment specifications
Primary fuelnatural gas
Reserve fueldiesel fuel
Number and brand of generators2 blocks of 235 MW each
On the map

The first unit with a capacity of 235 MW [6] was put into operation in commissioning mode [7] on October 1, 2018 [8] ; this unit was put into operation on November 1 [7] [9] . The second block of the thermal power plant reached its rated capacity on December 28, 2018 [9] . The official ceremony of putting the TPP into operation at full capacity was held on March 18, 2019 [10] .

Content

Construction

The construction of the power plant is carried out by Technopromexport (a subsidiary of Rostec Corporation) [4] .

On February 6, 2018, TPPs under construction in Crimea received official names. The Sevastopol CCGT-TPP is assigned the dispatch name Balaklava TPP, and the Simferopol CCGT-TPP - Tavricheskaya TPP. [eleven]

In February 2018, 330 kV outdoor switchgear was connected to the Crimean power system , new power lines were formed after cutting the 330 kV OHL by Dzhankoy – Simferopolskaya [12] .

In March 2018, the first ignition of turbine No. 1 was carried out, with an idle speed of 3 thousand revolutions per minute [13] . From September 7 to 10, complex tests of the first power unit [14] were carried out and on October 1, it was put into operation [8] in commissioning mode [7] . The second block of the thermal power plant reached its rated capacity on December 28, 2018 [9] . The official ceremony of putting the TPP into operation at full capacity was held on March 18, 2019 [10] .

Specifications

Two combined-cycle units of 235 MW each [15] . The main type of fuel is natural gas, emergency fuel is diesel [16] .

Simferopol (Tavricheskaya) TPP produces an electric voltage of 110 kV and 330 kV [16] .

Photo Gallery

  •  

    The commissioning ceremony of the Balaklava and Tauride TPPs with the participation of President of Russia Vladimir Putin , March 18, 2019.

  •  

    Substation 330kV Simferopol and Simferopol TPP

See also

  • Balaklava TPP
  • Simferopol TPP

Notes

  1. ↑ This facility is located on the territory of the Crimean Peninsula , most of which is the subject of territorial disagreements between Russia , which controls the disputed territory, and Ukraine , within the borders of which the disputed territory is recognized by the international community. According to the federal structure of Russia , the subjects of the Russian Federation are located in the disputed territory of Crimea - the Republic of Crimea and the city ​​of federal significance Sevastopol . According to the administrative division of Ukraine , the regions of Ukraine are located in the disputed territory of Crimea - the Autonomous Republic of Crimea and the city ​​with special status Sevastopol .
  2. ↑ According to the position of Russia
  3. ↑ According to the position of Ukraine
  4. ↑ 1 2 TPPs in Simferopol and Sevastopol will be built on time - Sheremet - RIA Novosti Crimea
  5. ↑ Deputy Head of the Ministry of Energy of the Russian Federation urged to accelerate the pace of construction of TPPs in Crimea - RIA Novosti Crimea
  6. ↑ The commissioning of the first power units of TPPs in the Crimea is scheduled for October (Russian) , RIA Novosti (September 4, 2018). Date of appeal September 14, 2018.
  7. ↑ 1 2 3 The commissioning of the first TPP units in Crimea is scheduled for early November (Neopr.) . TASS. Date of treatment October 2, 2018.
  8. ↑ 1 2 The first units of two TPPs in the Crimea were put into operation (Russian) , Interfax.ru (October 1, 2018). Date of treatment October 1, 2018.
  9. ↑ 1 2 3 The second unit of the Tauride TPP was brought to its rated capacity - Rostec (neopr.) . RIA. Date of treatment December 29, 2018.
  10. ↑ 1 2 Two new power plants (neopr.) Were launched in Crimea at the command of Putin . RBC. Date of treatment March 18, 2019.
  11. ↑ New Crimean power plants received official names (neopr.) . www.c-inform.info. Date of treatment February 6, 2018.
  12. ↑ Simferopol TPP is connected to the Crimean power system (Russian) , RIA Novosti Crimea (February 6, 2018). Date of appeal September 14, 2018.
  13. ↑ The first ignition of a gas turbine (Rus.) , The Russian newspaper (March 15, 2018), was carried out at Simferopol TPP . Date of appeal September 14, 2018.
  14. ↑ The first unit of the Tauride TPP is ready for commissioning - operator (Russian) , RIA Novosti Crimea (September 10, 2018). Date of appeal September 14, 2018.
  15. ↑ Nadezhda DATSYUK | Komsomolskaya Pravda website. 940 MW for the Crimea: Vladimir Putin launched the Tauride and Balaklava TPPs (Russian) . KP.RU - Komsomolskaya Pravda website (March 18, 2019). Date of treatment March 19, 2019.
  16. ↑ 1 2 New TPPs of Crimea: environmental friendliness, autonomy, water saving and seismic stability - RIA Novosti Crimea
Source - https://ru.wikipedia.org/w/index.php?title=Tavricheskaya_ TPP&oldid = 101623867


More articles:

  • Berezensky, Alexander Grigorievich
  • Family Budget (film)
  • List of European countries by minimum wage
  • Blank, Grigory Borisovich
  • Jazviny (Brest region)
  • Gardeners (Zhabinka district)
  • Streltsov, Boris Vasilievich
  • Dwarf Mongoose
  • Anishchik, Victor Mikhailovich
  • Cast Iron

All articles

Clever Geek | 2019