“Admiral of the Fleet of the Soviet Union Isakov” - Russian patrol ship ( frigate ) of the marine zone, the fourth ship of project 22350 .
| "Admiral of the Fleet of the Soviet Union Isakov" | |
|---|---|
| Service | |
| Named after | |
| Class and type of vessel | Project 22350 frigates |
| Organization | |
| Manufacturer | |
| Construction started | November 14, 2013 |
| Status | under construction |
| Main characteristics | |
| Displacement | 5,400 tons (full) |
| Length | 135 m (largest) |
| Width | 16 m |
| Draft | 4,5 m |
| Reservation | Local booking of add-ons and ammunition cellars. |
| Engines | M-55P diesel-gas turbine unit (CODAG scheme) manufactured by Turborus CJSC [1] , consisting of 2 afterburning gas turbine engines M90FR (NPO Saturn) [2] and 2 marching diesel engines 10D49 of Kolomensky Zavod [3] |
| Power | 7650 kW (10,400 hp) - diesel engines, 55,000 hp - afterburner turbines. 65,400 hp at full speed |
| Mover | two fixed pitch five-blade propellers |
| Speed | 30 knots |
| Sailing range | 4000 nautical miles |
| Autonomy of swimming | 30 days |
| Armament | |
| Navigational weapons | Navigation radar "Pal" - 2 pcs. |
| Radar weapons | Furke-3 general detection radar on the top of the mast, AFIM Polyment unit integrated into the mast structure (with a viewing angle of 360 degrees). |
| Electronic weapons | RLC Monument-M |
| Artillery | 1x1-130mm AU A-192 |
| Flak | Anti-aircraft missile and artillery complex (ZRAK) Broadsword - 2 installations |
| Missile weapons | Universal ship firing complex (UKKS) for 16 cells. Ammunition 16 rockets RCC ZM55 “Onyx” / 16 missiles RCC ZM54 / 16 missiles KRMB ZM14 / 16 missiles PLUR 91RT2 or their combinations in any proportions [4] . SAM "Poliment-Redut" (ammunition - 32 missiles 9M96E2) |
| Anti-submarine weapons | 12 torpedoes anti-submarine torpedo complex " Package-NK " [5] |
| Aviation group | 1 helicopter Ka-27 |
It is assumed that the “Admiral of the Fleet of the Soviet Union Isakov” will be the last frigate built according to the basic project - in the future the fleet plans to order ships of the improved project 22350M.
The frigate is named after Admiral Ivan Isakov .
Construction History
Laid on November 14, 2013 [6] .
In July 2017, at the Severnaya Verf shipyard, docking of frigate hull blocks began. By January 2018, it is planned to fully form the frigate’s hull [7] .
The transfer to the fleet is planned before the end of 2022 [8] .
Notes
- ↑ ZAO Turborus
- ↑ NPO Saturn
- ↑ Kolomna plant
- ↑ Morinformsystem-Agat (inaccessible link) . Date of treatment July 14, 2017. Archived December 25, 2011.
- ↑ Package-NK Archived on December 28, 2013.
- ↑ Northern Shipyard laid down a frigate and a reconnaissance ship for the Navy
- ↑ The hull of the fourth frigate of project 22350 will be formed by January 2018
- ↑ The Navy will receive the frigates Admiral Golovko and Admiral Isakov by the end of 2022