“Ryazanskaya” is a transport interchange hub (TPU) under construction, which, according to some sources, will become the largest in Moscow [3] [4] (however, this title is disputed by other TPUs under construction - “ Okruzhnaya ” [5] [6] , “ Moscow City " [7] [8] and" Salaryevo " [9] ) and in Europe [10] . The first phase of the Ryazanskaya interchange hub is planned to open in 2019 [11] .
| Project TPU "Ryazan" [1] | |
| Project TPU "Ryazan" [2] | |
Content
- 1 Location
- 2 Structure
- 3 Features
- 4 Construction
- 5 See also
- 6 notes
- 7 References
Location
The transportation hub will be located on the border of two districts of the Southeast administrative district of Moscow : Nizhny Novgorod and Lefortovo [12] . TPU territory is limited to Ryazan Avenue , Frezer highway and the Small Ring of the Moscow Railway . Previously, it housed garages, a department of the Ministry of Internal Affairs and a warehouse base [12] .
Structure
TPU will include [13] :
- the cross-platform metro station Nizhegorodskaya of the Nekrasovskaya and Bolshaya Koltsevaya lines (under construction, opening for the Nekrasovskaya line is planned in 2020);
- MCC Nizhny Novgorod station (valid);
- the Karacharovo station of the Gorky direction of the Moscow Railway (acts as an intermediate, in the future it may become a zone) [14] ;
- public business 45-story building with an area of 65 thousand m² (planned) [10] ;
- retail premises with an area of 14 thousand m² (planned) [10] ;
- parking for 500 cars (planned).
|
Features
All TPU facilities will be located on an area of 22.6 hectares [12] . The total area of the TPU itself will be 125 [13] –137 [15] thousand m², of which about 30 thousand m² will be occupied directly by the technological part serving for boarding, transferring and disembarking passengers [13] . Traffic flows from all TPU sections will lead to an underground distribution hall with an area of about 7 thousand m² [16] , which will be located at a depth of 6 meters, so that it will be possible to transfer to all types of transport (with the exception of ground public transport, the stops of which will be located on the surface ) without rising from the ground [13] [15] . The underground station will house ticket offices, a passenger terminal and a waiting room [16] . As of August 2018, the construction of the underground lobby of the portable Karacharovo station is underway with access to the surface on both sides of the railway [17] .
The estimated passenger flow of the unit is from 90,000 [15] to 125,000 [18] passengers per hour and about 600 thousand passengers per day [10] . Investments in the project amount to about 8.5 billion rubles [13] .
Construction
The construction of the metro station was started in 2014, commissioning is planned in 2020 [19] .
The construction of the MCC station was started in 2015, commissioning took place in 2016 along with the opening of passenger traffic of electric trains along the MCC [20] [21] . At the same time, the MCC Nizhny Novgorod station was built with a temporary exit (which in the future will become an emergency exit). The main entrances / exits with an escalator slope and elevators will be built after the construction of the underground part of the metro stations is completed - backlogs are left for them (2 square holes in the platform for elevator shafts and 2 rectangular holes for the stairs and the escalator slope).
From May 19, 2018, the Karacharovo stopping point was closed to passengers. On October 15, a new relocated platform [22] , partially located under the MCC overpass, began to operate. Passengers exit to the platform through an underpass equipped with turnstiles and ticket machines. On December 10, 2018, a second platform was opened, and a third was under construction. A fully stopping point opened in early 2019 [14] , and the tracks were completed at the end of May. As a result, 3 platforms appeared on the Karacharovo zone station, serving 6 through tracks [23] . The station may become the terminal for a number of trains, which will allow to unload the Kursky station [24] [25] .
It is planned to build a multi - level interchange with a turnover overpass on Ryazansky Prospekt and a two-way road for entry and exit from Ryazansky Prospekt to a transfer hub [15] . In 2019, it is planned to begin construction of a four-lane road to TPU from the Third Transport Ring [26] .
See also
- Glider (transport hub)
Notes
- ↑ The fourth main route on the section between Moscow and the Zheleznodorozhnaya station - Our transport (My metro)
- ↑ "Nizhny Novgorod" - Our transport (My subway)
- ↑ Alexander Skvortsov. The largest interchange hub being built in Moscow . press.rzd.ru . Press Service of JSC Russian Railways (August 1, 2016). Date of appeal April 18, 2017.
- ↑ Information service of the Stroykompleks portal. TPU "Ryazan" will be the largest in Moscow . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (November 10, 2016). Date of appeal April 18, 2017.
- ↑ The largest transport hub - M. Khusnullin Will be built at the Okruzhnaya metro station . stroinadzor.mos.ru . Moscow State Construction Supervision Committee (May 18, 2015). Date of appeal April 18, 2017.
- ↑ On the Lyublinsko-Dmitrovskaya metro line, 3 new stations are being prepared for opening . dt.mos.ru. Department of Transport and Development of Road Transport Infrastructure of the City of Moscow (August 29, 2016). Date of appeal April 18, 2017.
- ↑ Sobyanin: the largest transportation hub of the capital formed at Moscow City . special.tass.ru . TASS (April 13, 2015). Date of appeal April 18, 2017.
- ↑ The transportation hub in Moscow City will become the largest in the country - the mayor . m24.ru. Moscow 24 (May 29, 2015). Date of appeal April 18, 2017.
- ↑ Alena Cheryapkina. TPU “Salaryevo” will become the largest in Moscow . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (May 2, 2013). Date of appeal April 18, 2017.
- ↑ 1 2 3 4 Alesia Chernyavskaya. How to build the metro station "Nizhny Novgorod street" . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (August 14, 2017). Date of treatment August 14, 2017.
- ↑ TPU "Ryazan" . stroi.mos.ru. Date of treatment June 4, 2019.
- ↑ 1 2 3 Information service of the Stroykompleks portal. The Karacharovo railway platform will be relocated . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (February 16, 2016). Date of appeal April 18, 2017.
- ↑ 1 2 3 4 5 Information service of the Stroykompleks portal. The technological part of TPU Ryazan will be built in 2018 . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (April 5, 2017). Date of appeal April 18, 2017.
- ↑ 1 2 Sergey Sobyanin opened a new railway platform Karacharovo . Moscow website (January 10, 2019). Date of treatment June 4, 2019.
- ↑ 1 2 3 4 Information service of the Stroykompleks portal. TPU "Ryazan" will serve 90 thousand people per hour . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (April 3, 2017). Date of appeal April 18, 2017.
- ↑ 1 2 Evgeny Osipov. The underground station as part of the TPU Ryazan will be built before the end of 2018 . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (December 16, 2017). Date of treatment December 16, 2017.
- ↑ Karacharovo. We continue to wait. . Date of treatment August 16, 2018.
- ↑ Information service of the Stroykompleks portal. The largest in Russia TPU "Ryazan" will require about 7 billion rubles of investments . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (August 2, 2016). Date of appeal April 18, 2017.
- ↑ Moscow will build about 33 km of metro lines by the end of the year . stroi.mos.ru. Date of treatment March 31, 2019.
- ↑ Passenger traffic will be launched on the Moscow Central Ring . TASS . Date of treatment October 10, 2016.
- ↑ Passenger traffic has been launched on the Moscow Central Ring . TASS . Date of treatment October 10, 2016.
- ↑ The station is open: the free KM route to the Karacharovo platform is canceled , Moscow Website (October 15, 2018). Date of treatment November 19, 2018.
- ↑ Information service of the Stroykompleks portal. The transfer of the Karacharovo platform to the Nizhny Novgorod MCC will be completed in 2018 . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (October 5, 2017). Date of treatment October 7, 2017.
- ↑ Evgeny Osipov. Railway stations "Karacharovo" and "Aminievskaya" will become final for some trains . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (January 5, 2017). Date of appeal April 18, 2017.
- ↑ Information service of the Stroykompleks portal. Karacharovo may become the final railway station to reduce the load on the Kursky station . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (March 24, 2016). Date of appeal April 18, 2017.
- ↑ Evgeny Osipov. The new road will connect TPU Ryazanskaya and the Third Ring Road . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (December 16, 2017). Date of treatment December 16, 2017.
Links
- Information service portal Stroykompleksa. TPU "Ryazan" will become the largest interchange hub in Moscow . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (October 23, 2017). Date of treatment October 23, 2017.