Clever Geek Handbook
📜 ⬆️ ⬇️

Reduction and cooling units

CJSC Reduction and Cooling Units (CJSC “ROU”) is an industrial enterprise in Barnaul, Altai Territory. Specializes in the design and manufacture of power fittings.

Reduction and cooling units
Type ofClosed Joint Stock Company
Year of foundation2003
Location Russia Barnaul
Key figures

Chairman of the Management Board: Drozdov Mikhail Viktorovich

General Director: Evgeny Nagornev

Executive Director: Senkin Valery Nikolaevich

Managing Director: Krakhtinov Alexey Nikolaevich
Industryheat power engineering
Productspower fittings, steam converters, TPP piping elements
Number of employees500
Siterou.ru

Content

History

The company was founded on November 17, 2003 [1] . Then 20 people worked at CJSC “ROU”. In 2016, the fifth production building was commissioned.

Products

CJSC “ROU” produces equipment unique to the Russian market and follows industry standards when creating power fittings, steam converters and pipeline elements for:

  • systems of thermal and nuclear power plants with 4th safety class,
  • enterprises of the chemical, petrochemical sector and metallurgical industry,
  • pipelines transporting steam and water with a working pressure of up to 40 MPa and a temperature of up to 560 degrees Celsius with nominal passages from 6 to 1400 mm.

Among more than 2000 nomenclature products of CJSC “ROU”:

  • shutoff valves (gate valves and valves with manual and electric actuators, check valves and gates);
  • throttling-regulating valves (throttling, throttling-regulating, locking-throttling, regulating valves with manual and electric actuators);
  • protective fittings (direct-acting safety valves, pulse-safety devices, main safety valves);
  • steam traps;
  • piping elements (steam coolers, silencer assemblies and throttle devices, steam-water and jet nozzles);
  • equidistant tees, transitions and concentric transitions in accordance with OST for TPPs;
  • reduction and cooling plants (ROW), high-speed reduction and cooling plants (BROU), cooling plants (OU), reduction plants (RU);
  • electric drives for TPP fittings (core, built-in for control and shutoff valves).

Production Facilities

The line for the production of power fittings for medium, high and critical parameters. In 2010 , a laboratory was put into operation for conducting destructive and non-destructive testing methods, as well as its own foundry.

Sales

The products of ZAO “ROU” are widely known and in demand by the enterprises of the energy complex of Russia, the countries of the Near Abroad and Eastern Europe, as well as in the countries of Asia and America.

International Certification

In 2009, the quality management system of CJSC “ROU” received the SGS certificate (Switzerland) as meeting the requirements of ISO 9001: 2008.

In 2016, the company received a certificate of compliance of pipe fittings with the requirements of the EU Directive 97/23 / EC PED (pressure equipment) and harmonized European standards.

Social Responsibility

 
Dynamo Ice Sports Palace in Barnaul

The company acts as the general sponsor of HC Dynamo, Barnaul [2] .

In 2016, CJSC “ROU” implemented a large-scale project for the construction of the Dynamo Ice Sports Palace in Barnaul. On September 13, the official opening ceremony of the Dynamo LDS took place on 3 Jasmine Street.

LDS consists of three blocks in which sports facilities are located (two ice arenas 30x60 and 20x45 meters in size), public and technical facilities, locker rooms, stands, a recreation area and other functional rooms. The Ice Palace is equipped with its own substation and a modular gas boiler.

Not far from the Dynamo Ice Palace, another sports palace will be built, as well as a martial arts center, tennis courts, several football fields. All these facilities will be combined into a sports cluster. [3] The project aroused interest and was praised by the authorities [4] .

The plant takes part in the improvement of the city of Barnaul [5] .

Notes

  1. ↑ Valery Senkin: “... Each station has its own soul” (neopr.) . www.rusexporter.ru. Date of treatment September 6, 2016.
  2. ↑ HC Dynamo Barnaul - the official website of the hockey club (neopr.) . hcdinamo.su. Date of treatment September 6, 2016.
  3. ↑ Opening of the Dynamo ice sports palace in the capital of Altai Krai (Neopr.) . www.altairegion22.ru. Date of appeal September 21, 2016.
  4. ↑ Assistant to the President of Russia Igor Levitin: An exclusive sports facility in the Altai Territory may become typical for Russian hockey (neopr.) . www.altairegion22.ru. Date of treatment September 6, 2016.
  5. ↑ The enterprises of the Oktyabrsky district help in the improvement of BARNAUL :: The official website of the city (Neopr.) . barnaul.org. Date of treatment September 6, 2016. (unavailable link)

Links

  • Official site of CJSC "ROU"


Source - https://ru.wikipedia.org/w/index.php?title=Reduction and cooling_installations&oldid = 96176707


More articles:

  • Hirey Direnfurt
  • Zoldyreva, Raisa Nikolaevna
  • Gabon National Assembly
  • Arsenal San Francisco
  • Legislative Election in Gabon (1964)
  • Haibaching
  • Bausch & Lomb
  • Whitfield, Evan
  • Vukoslavlevich, Vladan
  • Species of the Turner family

All articles

Clever Geek | 2019