Kutuzovskaya is a stopping point / passenger platform of the Small Ring of the Moscow Railway serving the route of the city electric train - the Moscow Central Ring . Located within the boundaries of Presnya station. Opened on September 10, 2016 , together with the opening of passenger traffic of the MCC electric trains [1] [2] .
| Platform | |
| Kutuzovskaya | |
|---|---|
| | |
| Moscow railway | |
| Station | Presnya , Kutuzovo Park |
| Region w. d. | Moscow-Kursk |
| opening date | September 10, 2016 |
| Design name | Kutuzovo |
| Type of | passenger |
| Number of platforms | one |
| Number of paths | 2 |
| Platform type | island |
| Platform shape | curved |
| Platform length, m | 180 |
| Exit to | Kutuzovsky Prospekt |
| Location | Dorogomilovo |
| Transplant at the station | |
| Change to | A : m2, m27 , 91, 116, 157, 205, 454, 474, 477, 840, T39, H2 Tb : 7 |
| Distance to the intersection with the main railway | 39.0 km |
It is equipped with turnstiles , there is a direct indoor transfer to the eponymous ground station of the Filyovskaya line metro .
Location
The platform is located in the Western administrative district on the territory of the Dorogomilovo district at the intersection of the line with Kutuzovsky Prospekt and is located within the precinct Presnya station parallel to the metro station of the same name. Earlier, at the location of the platform was the Kutuzovo station, now a park of Presnya station.
Specifications
The MCC station includes one high island platform and two two-story vestibules located on opposite sides of Kutuzovsky Prospekt [3] .
The station platform has a curved shape and is parallel to the platforms of the Filyovskaya line metro station. The middle of the platform is located under the road overpass Kutuzovsky Prospekt, passing over the Small Ring and Filevskaya metro line.
Lobbies and Transplants
Both lobbies are located at the level of the Kutuzovsky Prospekt road viaduct above both lines and allow for an off-street transfer to the corresponding vestibules of the Filyovskaya line metro station of the same name , while there is no open-door transfer between the metro and the MCC. Metro and MCC passengers can transfer between lines with ticket control, but without additional cancellation of the trip within 90 minutes from the first pass, if the passenger saved and attached the ticket that he had previously used for entry, while changing from the MCC via the north the lobby is not a trip at all (no attachment required). There are ticket offices and turnstiles in the vestibules, which use unified transport cards of Moscow transport, which are also used to travel in the subway and urban ground transport, for passage and extinguishing trips.
The southern lobby opened simultaneously with the launch of traffic along the MCC (September 10, 2016), the northern - July 10, 2017. The southern entrance hall is combined with the southern entrance hall of the metro station, stairs lead to the platform from it. The north lobby of the station is combined with the recently refurbished northern lobby of the metro station. The area of ββthe northern lobby is 940 mΒ², height - more than 7 meters; it is finished with granite and travertine ; the floor and stairs are covered with unpolished heat-treated granite slabs [3] .
A free transfer is also possible on the used ticket to the β Victory Park β station, however this transfer is conditional, since the stations are more than a kilometer away from each other.
Passenger
Of the 31 stations of the MCC, Kutuzovskaya ranks fourth in popularity. In 2017, the average passenger flow by entry and exit amounted to 30 thousand people. per day and 902 thousand people. per month [4] .
Gallery
|
See also
- List of Moscow railway stations and platforms
Notes
- β Passenger traffic will be launched on the Moscow Central Ring . TASS . Date of treatment October 10, 2016.
- β Passenger traffic has been launched on the Moscow Central Ring . TASS . Date of treatment October 10, 2016.
- β 1 2 Olga Zenevich. The northern entrance hall of the Kutuzovskaya - Sobyanin opened . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (July 10, 2017). Date of treatment July 10, 2017.
- β railway media | Statistics on passenger traffic at the MCC 2017
Links
- The official website of the subway . Date of treatment February 1, 2018.
- Scheme of the station, exits and transitions . Date of treatment February 1, 2018.