The Chongqing-Chengdu Intercity High-Speed Rail ( Chinese 成渝 客运 专线 ) is a 307-km high-speed railway in Sichuan Province, connecting the capital of Chengdu Province with Chongqing City. The road is designed for a speed of 350 km / h, the estimated travel time is 75 minutes, but modern high-speed trains (2016) run about 100 minutes. The road was built commissioned in December 2015 [1] .
| Chongqing - Chengdu Intercity Railway 成渝 客运 专线 | |
|---|---|
High-speed train model CRH380D in Jianyang | |
| general information | |
| A country | |
| Type of | High-speed railway |
| condition | passenger traffic |
| End stations | Chengdu -Eastern Chongqing |
| Number of stations | 12 |
| Service | |
| opening date | December 26, 2015 |
| Subordination | |
| Technical details | |
| Length | 307 km |
| Track width | 1435 mm |
| Type of electrification | and |
| Speed Limit | 300 km / h |
| Chongqing - Chengdu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Line length: | 307 km | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track: | 1435 mm mm | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Maximum speed: | 350 km / h | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Stations | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Legend
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Chongqing - Chengdu Intercity Railway | |||||||
|---|---|---|---|---|---|---|---|
| Simplified Chinese : | 成渝 客运 专线 | ||||||
| traditional chinese : | 成渝 客運 專線 | ||||||
| |||||||
Construction History
Traffic between cities has already been carried out by other railways, there is the usual Chengdu-Chongqing Railway , and also a high-speed route through Suining , but this project was able to significantly reduce travel time by introducing tunnels and dams. Four main dams and two tunnels were built on the highway.
Construction of the road began on March 22, 2010 from Chongqing, and the Sichuan part of the road began to be built on November 11. The last tunnel was broken on December 16, 2013, and the opening of the road was planned by the end of 2014. Passenger traffic began on December 26, 2015, to Chongqing - North Station, and Shapingba Station was opened in January 2016 after repairs, allowing trains to head to Chongqing Main Station. [2]
The road is part of a network designated as the Shanghai-Wuhan-Chengdu High-Speed Passenger Line .
Stops
The road consists of 12 stations:
Sichuan section:
- Chengdu -Eastern ( Chinese 成都 东 站 )
- Jianyang - South ( Chinese 简阳 南 站 )
- Ziyang -North ( Chinese 资 阳 北 站 )
- Zizhong -North ( Chinese 资 中 北 站 )
- Neijiang -North ( Chinese 、 内 江北 站 )
- Lunchan -North ( Chinese 隆昌 北 站 )
Chongqing section:
- Rongchang -North ( Chinese 荣昌 北 站 )
- Dazu- South ( Chinese 大 足 南 站 )
- Yunchuan -Eastern ( Chinese 永川 东 站 )
- Bishan ( Chinese 璧山 站 )
- Shapinba ( Chinese 沙坪坝 站 )
- Chongqing ( Chinese 达州 站 ))
Notes
- ↑ 成渝 客运 专线 最快 2014 年 通车 Archived December 17, 2013. , luzhouol.cn, 2012-07-31
- ↑ Chengyu Passenger Line achieves breakthrough