Tekstilshchiki is the Moscow metro station under construction on the Big Ring Line . It will be connected with the Tekstilshchiki station on the Tagansko-Krasnopresnenskaya line . It will be located on the border of Pechatniki and Tekstilshchiki ( SEAD ) districts , the latter of which got its name. The opening is scheduled for 2023 as part of the Nizhny Novgorod Street - Kashirskaya section [1] . Shallow columned station with two coastal platforms.
| "Textile workers" | |
|---|---|
Large circle line | |
| Moscow subway | |
Station project | |
| Area | Textile workers , Printers |
| County | SEAD |
| Estimated Opening Date | 2023 year [1] |
| Design name | Chesmenskaya |
| Type of | shallow pillar [2] |
| Number of platforms | 2 [2] |
| Type of platforms | coastal [2] |
| Transitions at the station | |
| Exit to the streets | Volgogradsky Prospekt , Lublin , Highway |
| Nearby Stations | and |
Content
Location and transfers
The station will be located between Volgogradsky Prospekt , Lublin and Shosseinaya streets [2] . It is planned to use part of the infrastructure already existing at the Tekstilshchiki station of the Tagansko-Krasnopresnenskaya line , including the existing under-the-cross passage, for organizing dry-leg transplants to the station of the same name on the Tagansko-Krasnopresnenskaya line and the Kursk direction platform of the Moscow Railway [2] .
Construction
In May 2017, an open tender was announced for the construction of a metro section that includes this station. According to the data from the draft agreement from the tender documentation, the contractor’s exit to the construction sites is planned no later than October 16, 2017, the start of tunneling - no later than July 1, 2018 [3] , the completion of all work - no later than July 18, 2020 [4] . The contract for the construction and installation works was signed on July 10, 2017 with the contractor MIP-STROY No. 1 LLC [5] . The general designer of the Moscow Metro stations is Mosinzhproekt JSC, the site designer is the NIPII Lenmetrogiprotrans OJSC.
The construction of the station began on November 18, 2017 [2] , but on September 20, 2018, Marat Khusnullin denied this information, saying that the active construction of the station will begin in 2019 [6] . As of January 20, 2019, the station’s site was mastered by the contractor " MIP STROY -1 LLC, construction of the wall in the ground has begun
Architecture and Design
Shallow columned station with two coastal platforms [2] .
Notes
- ↑ 1 2 In the future there are four lines: how the metro is developing in TiNAO , Moscow Website (August 8, 2018). Date of treatment August 16, 2018.
- ↑ 1 2 3 4 5 6 7 Moscow Media . Hotels, parks and three Tekstilshchiki stations. What will be the first section of the TPK . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (November 16, 2017). Date of treatment November 18, 2017.
- ↑ Contract for the implementation of a set of construction and installation works for the removal of utilities, Tekstilshchiki, Pechatniki, Nagatinsky Zaton, Klenovy Boulevard station complexes, distillation tunnels with tunnels in the area from platform No. 8 to station “Kashirskaya” for the facility East section of the Third Interchange Circuit (TPK) st. "Nizhny Novgorod street" - Art. "Kashirskaya". (pdf). Procurement Documents . Official site of the Unified Information System in the field of procurement (May 31, 2017). Date of treatment June 4, 2017.
- ↑ Information service of the Stroykompleks portal. Moscow is looking for builders of the eastern section of the Second metro ring . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (May 26, 2017). Date of appeal May 26, 2017.
- ↑ Information about the contract No. 57701885820170003460000 . zakupki.gov.ru . Official site of the Unified Procurement Information System (July 10, 2017). Date of treatment July 15, 2017.
- ↑ Big metro ring in the southeast of the city will begin to be actively built in 2019 - Khusnullin