Kuban Hydroelectric Power Station-1 ( Kurshavskaya Hydroelectric Power Station-1 ) is a hydroelectric power station in Karachaevo-Cherkessia , near the village of Oktyabrsky Prikubansky District, at the 63rd kilometer of the Great Stavropol Canal . It is part of the Kuban Hydroelectric Power Station Cascade (a group of the Kursavsky Hydroelectric Power Station ), being its second stage. The owner of Kuban HPS-1 is PJSC RusHydro.
| Kuban Hydroelectric Power Station-1 | |
|---|---|
| A country | |
| Location | |
| Owner | RusHydro |
| Status | acting |
| Year of commencement of construction | 1961 |
| Years of input units | 1967-1968 |
| Main characteristics | |
| Annual electricity production, mln kWh | 197.3 |
| Kind of power plant | derivational |
| Design head , m | 49.8 |
| Electric power, MW | 37 |
| Equipment specifications | |
| Type of turbines | radial axial |
| Number and brand of turbines | 2 Γ PO75-B-250 |
| Flow through turbines, mΒ³ / s | 2 Γ 45 |
| Number and brand of generators | 2 Γ HCV 525 / 119-32 |
| Power of generators, MW | 2 Γ 18.5 |
| Main facilities | |
| Dam type | not |
| Gateway | not |
| Outdoor switchgear | 110 kV |
| On the map | |
Hydroelectric power stations began to be built in 1961. The first hydropower unit was launched in 1967, the second - in 1968. In 1985, the turbines were replaced. The hydroelectric power station was built according to the derivational type. It operates on the drain of the Bolshoi Stavropol Canal, and has no regulation of reservoirs or basins.
The composition of hydroelectric power plants:
- water intake;
- 720 m double-flow pressure pipe;
- hydroelectric power station building 48 m long;
- outlet channel;
- a single spillway consisting of a head, a tray 795 m long, and a water well;
- a discharge channel of an idle spillway 315 m long;
- gateway regulator No. 2 on the Great Stavropol Canal;
- Outdoor switchgear 110 kV.
The capacity of the hydroelectric power station is 37 MW, the average annual output is 197.3 million kWh. Two hydroelectric units with a capacity of 18.5 MW each with radial-axis turbines RO75-V-250 operating at a design head of 49.8 m were installed in the building of the hydroelectric power station. The manufacturer of hydraulic turbines is Kharkov Turboatom, and the generators are Uralelectrotyazhmash [1] . HPP equipment is outdated and worn out (wear rate 90%).
Notes
- β HPS-1
Literature
- Hydroelectric power stations in the head part of the Kuban-Kalauskaya irrigation and irrigation system. Technical report on the design and construction of 1961-1972 - M .: Energy, 1974.- 223 p.
- Hydroelectric power stations of Russia. - M .: Printing house of the Institute Hydroproject, 1998. - 467 p.