Energy ring of St. Petersburg

The energy ring of St. Petersburg is the ring power supply network of St. Petersburg .

Outdoor switchgear 110 kV substation "East"

It consists of seven substations ( Vasileostrovskaya , Vostochnaya , Volkhov-Severnaya , Zavod Ilyich, Severnaya, Parnas and Zapadnaya) and 95 km of 330 kilovolt power lines upgraded by 2013.

The ring was put into operation on November 22, 2013 [1] . The fifth substation - “Vasileostrovskaya” - was included in the network on November 29, 2014 [2] .

It is an investment project of FGC UES . Investments in the construction of the energy ring amounted to 32.3 billion rubles.

The western part of the ring 4 km long was laid along the bottom of the Gulf of Finland [3] .

The acceleration of the project was greatly affected by the large-scale accident at Vostochnaya station in 2010 , as a result of which 2.5 million people were left without electricity, many trains of the Oktyabrskaya Railway and trains of the St. Petersburg metro stopped [1] .

In addition to this inner ring, in 2015, FGC UES plans to build a second, external one, which will completely pass outside the city .

The construction of the ring significantly increases the reliability of energy networks and power facilities [4] .

In December 2017, the modernization of the Zapadnaya substation, built in 1986, was completed [5] .

In December 2018, the reconstruction of the Zavod Ilyich substation, which has been ongoing since 2008, was completed. Its capacity increased to 1220 MVA [6] [7] .

In April 2019, the capacity of the Vostochnaya substation was increased to 1850 MVA [8] .

See also

  • Moscow energy ring

Notes

  1. ↑ 1 2 330 kW power ring began to operate in St. Petersburg // RIA Novosti, 2013-11-22
  2. ↑ The system operator provided operational conditions for the commissioning of the 330 kV Vasileostrovskaya substation - the final element of the energy ring of St. Petersburg
  3. ↑ An energy ring was commissioned in St. Petersburg // 11.22.2013
  4. ↑ FGC UES will close the energy ring around St. Petersburg two years earlier due to blackout // Bigpower Electric, September 01, 2010
  5. ↑ http://www.fsk-ees.ru/about/affiliates/mes_north_west/news/details.php?ELEMENT_ID=223029
  6. ↑ http://www.fsk-ees.ru/about/affiliates/mes_north_west/news/details.php?ELEMENT_ID=211579
  7. ↑ http://www.fsk-ees.ru/press_center/company_news/?ELEMENT_ID=233643
  8. ↑ http://www.fsk-ees.ru/press_center/company_news/?ELEMENT_ID=237496

Links

  • Petersburg energy ring 330 kV , Map and description of the energy ring // FGC UES
  • The energy ring is not a simple decoration. How FGC implements its main project in the Northern capital // Newspaper FGC UES, January 2011


Source - https://ru.wikipedia.org/w/index.php?title=Energetic_ ring_St. Petersburg_old&oldid = 99332700


More articles:

  • Rhodamine
  • Nate
  • Physical-geographical zoning of Ukraine
  • Ʋ
  • Larsen, Thuger
  • Naver
  • Robert Rupp
  • Korolev, Eugene Nikiforovich
  • Maslov, Sergey Vladimirovich (Hero of the Russian Federation)
  • Wings of Fury

All articles

Clever Geek | 2019