Clever Geek Handbook
📜 ⬆️ ⬇️

Novorossiysk - Feodosia

Ferry Novorossiysk

Novorossiysk - Feodosia is the first of three specialized ferry services opened in 2014. Carried out the transportation of heavy vehicles across the Kerch Strait between Novorossiysk and Feodosia from May 1 [1] to October 4, 2014.

The Poseidon Express freight car ferry was the first on the line. [2]

Description

The organizer of the route was the ANO “Unified Transport Directorate”. [3]

The end points of the route were the sea trade ports of Novorossiysk and Feodosia. The Novorossiysk – Feodosiya route was the main route for transporting trucks to the Crimea and back, since the ferry port Port Kavkaz - Port Krym was reoriented exclusively for passenger transportation in May 2014. [3]

Two ferries operated on the line in reverse movement with respect to each other. [3] In one trip, ferries were able to carry up to 85 trucks (13,867 tons of cargo). [3] The travel time was 8 - 9 hours [3] with a length of 191 km [4] .

The line began operations on May 1, 2014, when the first 48 trucks departed from Novorossiysk to the Feodosia Commercial Sea Port . [one]

From May 1 to 12, about 1,500 trucks were transported on the Poseidon Express vessel. Including from Novorossiysk to Feodosia 700 heavy trucks in the opposite direction - 650. [5]

In total, in May 2014, the Poseidon Express ferry made 15 circular flights. [6] 40 thousand tons of cargo (1,400 trucks) and 1,5 thousand passengers were transported from Novorossiysk to Feodosia. [6] In the opposite direction - 33 thousand tons of cargo or 1300 cars and the same number of passengers. [6]

From July 1 to September 15, 2014, ferries made 177 flights, 14,400 heavy cargo were transported (7,400 to the Crimea, 7,000 from the Crimea). [7]

Ferries

 
Poseidon Express
  • Poseidon Express (formerly Translubeca) is the first ferry on the line. Recalled after the arrival of Sevastopol. The new ferries Novorossiysk and Sevastopol are more economical in fuel consumption and have a license for the transport of dangerous goods. [8] In addition, time ships are cheaper on these ships. [eight]
  • Novorossiysk (formerly known as Ulus 1) has been on the line since June 9, 2014 [3]
  • "Sevastopol" (formerly called "Ulusoy 6") on the line since July 3, 2014 [3]

Alternative Routes

Due to long lines and long waiting times for loading, the Unified Transport Directorate suggested that carriers use rail transport. [9] It was pointed out that the Crimea-Caucasus railway ferry was only 30% loaded. [ten]

On July 8, 2014, the Novorossiysk – Kerch line was opened [11] , on which Petersburg ferry began to operate with a cargo capacity of 1.57 thousand linear meters, capable of taking on board up to 95 trucks. [11] Loading of the ferry on the Novorossiysk – Kerch line was only 40-60%, while on the Novorossiysk – Feodosiya line, the cars were waiting for loading from one to three days. [12] [7]

Notes

  1. ↑ 1 2 The first 48 trucks departed from Novorossiysk to Feodosia on the Poseidon Express ship (unopened) (inaccessible link) . ANO "Unified Transport Directorate" (05/01/2014). Date of treatment July 4, 2014. Archived March 4, 2016.
  2. ↑ The Poseidon Express freight car ferry (Neopr.) Arrived on the Novorossiysk-Feodosia line . Novoross. info (April 29, 2014). Date of treatment May 12, 2014.
  3. ↑ 1 2 3 4 5 6 7 Ferry port “Novorossiysk” - port “Feodosia” (unopened) (inaccessible link) . ANO "Unified Transport Directorate". Date of treatment July 4, 2014. Archived March 4, 2016.
  4. ↑ ETD explains the increase in freight transportation on the Novorossiysk - Feodosiya line due to its high cost (neopr.) . RZD-Partner (06/10/2014). Date of treatment July 7, 2014.
  5. ↑ In the first half of May, about 1,500 trucks were transported from Novorossiysk to Feodosia (neopr.) . ANO "Unified Transport Directorate" (05/14/2014). Date of treatment July 4, 2014. (unavailable link)
  6. ↑ 1 2 3 ETD. In May, ferries made 1,000 ferries at the Kerch crossing (neopr.) . Business newspaper. South (June 3, 2014). Date of treatment July 24, 2014.
  7. ↑ 1 2 ETD. From July 1, 2014, more than 14.4 thousand trucks (neopr.) Were transported from Novorossiysk to Feodosia and back . PortNews (September 16, 2014). Date of treatment September 17, 2014.
  8. ↑ 1 2 Poseidon Express truck ferry no longer operates at the Kerch crossing (neopr.) . DorInfo (07/04/2014). Date of treatment July 4, 2014.
  9. ↑ Cargo carriers in Crimea are offered to look for an alternative (neopr.) . Logirus (May 21, 2014). Date of treatment July 7, 2014.
  10. ↑ In Crimea, they are campaigning for the railway. The cargo has not yet been listened to (neopr.) . Logirus (June 25, 2014). Date of treatment July 7, 2014.
  11. ↑ 1 2 A new ferry with a capacity of 95 cars began to run on the Novorossiysk-Kerch line (neopr.) . Maritime news of Russia (07/08/2014). Date of treatment July 8, 2014.
  12. ↑ Between Novorossiysk and Kerch the passenger-and-freight ferry Petersburg began to run (neopr.) . Kryminform (July 16, 2014). Date of treatment July 17, 2014.

Links

  • Photo report - transportation to Crimea
Source - https://ru.wikipedia.org/w/index.php?title=Novorossiysk_—_Feodosia&oldid=101551379


More articles:

  • They have a homeland
  • Skuchalov, Alexey Vasilievich
  • Sinelnikov, Peter Andreevich
  • Stotz, Karl
  • Grünert, Julius Theodore
  • Gregory David
  • Kalmanov, Alan Batrovich
  • Maslyukov, Yuri Dmitrievich
  • Quiwo
  • Hearing Preservation Program

All articles

Clever Geek | 2019