Platov Airport ( IATA : ROV , ICAO : URRP ) is the international airport of Rostov-on-Don , the successor of the old airport on Sholokhov Avenue . Located 29 kilometers north-east of Rostov-on-Don in the Aksai district of the Rostov region , 15 km north-west of the city of Novocherkassk (4 km north of the village of Grushevskaya , near the federal highway M-4 ). Named in honor of the Cossack ataman Matvey Platov .
| Platov International Airport | |||||||
|---|---|---|---|---|---|---|---|
| IATA : ROV - ICAO : URRP - Int . Code : ROV | |||||||
| Information | |||||||
| Type of | civil | ||||||
| A country | Russia | ||||||
| Location | Rostov region | ||||||
| opening date | December 7, 2017 [1] | ||||||
| Operator | Airports of the Regions | ||||||
| Hub for | Azimuth | ||||||
| NUM height | |||||||
| Square | 50,629 m² | ||||||
| Timezone | UTC + 3 | ||||||
| Site | rov.aero | ||||||
| Map | |||||||
Location of the airport on the map of the Rostov region | |||||||
| Runways | |||||||
| |||||||
| Statistics | |||||||
| Annual passenger traffic | 3.236 million (2018) [2] | ||||||
The new Rostov airport was built in preparation for the 2018 World Cup [3] . The first large airport built in the modern history of Russia [4] , the third in terms of passenger traffic (after Sochi and Krasnodar) in the Southern Federal District [5] . For regular flights, the airport is open from December 7, 2017 [1] .
The airfield is approved for receiving Airbus A310 , Airbus A319 , Airbus A320 , Airbus A321, Airbus A330 , Boeing 737 , Boeing 747 , Boeing 757 , Boeing 767 , Boeing-777 , CRJ , An-124 , Il-62 , Il-76 , Tu-154 , Tu-204 and all the lighter, as well as all types of helicopters . The classification number of the runway ( PCN ) 57 / R / A / W / T [6] , the runway is equipped according to category II of ICAO [7] .
In February 2019, the airport received a rating of 5 stars according to the results of an audit conducted by experts from the authoritative international rating organization Skytrax ( United Kingdom ). The Russian airport has been awarded this rating for the first time since its existence since 1989 [8] [9] .
Title
Initially, the airport had the working title “Yuzhny”. In the course of a popular vote organized by the Government of the Rostov Region , the name “Platov” won, over 15.8 thousand votes (40%) , in honor of the Cossack ataman Matvey Platov . Other options - “Rostov-on-Don” and “Yuzhny” - scored more than 13 thousand and 11.6 thousand votes, respectively [10] [11] .
On January 20, 2017, the Government of the Russian Federation officially assigned the name “Platov” to the airport [12] .
History
Designing
The general design of the airport was carried out by Aeroproject , the design of the air terminal was done by the German company Assman Beraten + Planen [13] , and the architectural concept for it was the British bureau Twelve Architects and its architect Alex Beatus, who had previously participated in the design of the terminal 3 of Domodedovo Airport and Lahta Center towers in St. Petersburg . According to Alex Beatus, the concept was based on the River Don, its waves and bridges [14] .
Class B airport [15] is designed with a single runway with dimensions of 3,600 by 45 meters [16] and a passenger terminal with an area of 50,000 m², carrying capacity of 2 thousand passengers per hour and 5 million passengers per year, with 9 telescopes [17] and 10 exits to apron buses. The project also laid the possibility of building a second runway in parallel with the first on the other side of the terminal if such a need arises. In addition, the project of the terminal also reserved the possibility of its expansion in both directions with an increase in passenger traffic above 5 million people. Designed for use by most types of aircraft. In addition, the construction of a cargo terminal with an area of 5200 m² and parking for 2500 cars [18] was designed .
The development of interior design for business passengers was carried out by two architectural bureaus - Nefa Architects (hall of domestic linear lines, concept “Step”) and studio VOX Architects (hall of IAL, project “Sun. Air. Shores”).
Construction
The construction of the airport began in 2014 and was completed in July 2017, and the commissioning and transfer of all flights took place on the same day, December 7, 2017 [1] [19] . The construction project was included in the Federal program of preparation for the World Cup in 2018 , as well as in the Federal Target Program "Development of the Transport System of Russia (2010-2020)" [20] . The investor of the construction and the owner of the terminal was the holding “ Airports of the Regions ” (the project manager is Grigory Udintsev).
- Stages of construction
Construction in November 2015
Construction in January 2016
Construction in January 2017
| date | Event | Note |
|---|---|---|
| May 12, 2012 | General plan of the Grushevsky rural settlement (as amended) Approved by the decision of the meeting of deputies of the Grushevsky rural settlement of 12.05.2012. No. 172 [21] . | |
| 08.16.2012 | Resolution of the Government of the Rostov Region dated August 16, 2012 No. 777 On approval of the section “Zones of the planned location of capital construction projects at the Yuzhny airport complex of the main part of the project for planning and surveying the territory within the boundaries of the planned location of the Yuzhny airport complex [22] . | |
| 10/14/2012 | Elections of heads of urban and rural settlements and representative bodies of local self-government Konstantin Domorovsky was elected head of the rural settlement of Grushevsky [23] . | |
| 13.06.2013 | Dmitry Medvedev doubts the feasibility of building the South Airport for the 2018 World Cup And predicts delays during its construction [24] . | |
| 07/02/2013 | Placing order №0158200002813000009 Provision of services for conducting a market valuation of 23 land plots with an area of 612,229 hectares, which are subject to seizure for state needs of the Rostov region in order to accommodate the facilities of the first stage of the construction of the Yuzhny airport complex [25] . | |
| 07/15/2013 | Winner of quotation request The winner was the Limited Liability Company “Avers Appraisal Center” [26] . | The cost of the work is 13 thousand rubles - all estimated costs included 612.2 hectares of land to be redeemed for the construction of the airport, including taxes [27] . |
| 08.09.2013 | Compiled reports on the assessment of the market value of land For each site separately, in one day and on 175 pages. The plots are estimated by the income approach on average 89 thousand rubles per hectare [28] . The cost and comparative approaches were also considered, but not applied to the plots for unreasonable reasons. | |
| 09/13/2013 | Public hearings on the project planning and surveying of land, with the participation of the owners and representatives of ministries of the Government of the Rostov region Owners refuse with redemption value. Representatives of the ministries were surprised by the availability of land reserve fund [29] . | The following hearings are postponed for a month due to the fact that some owners agree to consider the issue of exchanging plots for identical ones. |
| 09/23/2013 | A cooperation agreement was signed between the Ministry of Transport of the Russian Federation, the Government of the Rostov Region and the Renova Group of Companies On the implementation of the investment project "Construction of the airport complex" Yuzhny " [30] . | |
| 10.10.2013 | Announcement of the winner in the international competition for the development of the architectural design of the airport complex of the airport "Yuzhny" Recognized by the London company "Twelve Architects" [31] . | |
| 10/17/2013 | A criminal case has been initiated against the president of the Avers group of companies, three managers of the Avers Rating Center LLC and the General Director of Grade Plus LLC, who acted as an accomplice, on the fact of an attempt at commercial bribery and complicity in it [32] . | |
| 10/18/2013 | Collection of owners of land shares [33] . The proposed plots are not suitable for cultivation: the owners refuse such an exchange. Representatives of the ministries propose the following: the owners perform their own assessments; draw up a protocol of disagreements, stating that they agree with the repurchase, but disagree with the price; go to court with him before the expiration of the year and resolve the issue in court. | Representatives of the Ministry of Property and Land Relations, financial rehabilitation of enterprises, organizations of the Rostov region refuse to comment on the criminal case against the management of the valuer company. |
| 01.23.2015 | Excavation and construction of water supply facilities are underway, and they are planned to be completed by the beginning of June 2015 [34] . | |
| 06.19.2015 | The general contractor for the terminal construction was Limak Holding ( Turkey ) [35] . | Limak Holding (Turkey) is a large construction company specializing in the construction of airports. |
| 08/25/2015 | The earthworks have been completed by 97%, the airfield part is being built ahead of schedule. The construction of the terminal by the investor ( Airports of the Regions ) [36] has also begun. | |
| 10.26.2015 | The first 200 (out of 2500) piles are driven into the base of the terminal [37] . Pile fields have been completed for the production and domestic building and the warehouse of material and technical supply, continue in the building of state control bodies (about 50%) and administrative and technological (10%). The completion of the pile fields by the investor is scheduled until the end of the year. | Nearly 600 builders and 88 pieces of equipment are working at the terminal building site. |
| 11/14/2015 | 2.5 kilometers of the runway were laid - in rubble, 1.5 kilometers - in “lean” concrete (by the second quarter of 2016, completely in “lean”). Began landscaping lawns [38] . | In total, almost one and a half thousand workers and more than 320 units of equipment work at the construction site. |
| 05/30/2016 | At 2.7 kilometers of the runway laid the top layer of concrete. It is planned to complete the laying of concrete by November 2016. The foundation of the building of the cargo complex is under construction (780 piles are driven at the base, the grillages are being cast). | By the end of the year, it is planned to complete the erection of frames for all buildings and close the “heat circuit” in order to begin finishing work in the winter. |
| 06.23.2016 | 63% ready apron and 81% - the runway. Fully completed excavation and construction of the gravel base of the airfield. A drainage and drainage system is installed at 70% - these are 41 km of pipes [39] . | By the end of the month, the completion of monolithic work on the passenger terminal, the installation of metal structures is underway, and the construction of capital internal partitions has begun [39] . |
| 07.11.2016 | Readiness: 100% - runway, 70% - apron, taxiways — 17% -50% [40] . | By 2017, plans to build roads connecting the airport with the highway M4 and the northern bypass of the city of Rostov-on-Don [41] . |
| 10/13/2016 | By the winter of 2016 it is planned to close the thermal contour of the entire terminal (finish the facade and roof). | On the side “wings” of the terminal, the facade and roof are completed. |
| 01.18.2017 | The terminal is ready by 62%, the objects of the service-technical infrastructure by 59.5%, the building of the service of special transport and repair by 89%, the cargo terminal by 69%, improvement of the adjacent territory by 71% [42] . | In the terminal building, the installation of the roof and stained glass, sandwich panels, and a ventilated facade is completed. On the landing galleries are completing interior finishing work. |
| 03/27/2017 | The complex as a whole is 72% ready (with a plan of 69%), a terminal by 71%, a cargo warehouse by 78%, 87% from buildings of state control bodies, 73% from Duty Free warehouses [43] . | The closure of the “warm contour” has been completed, general construction works have been completed in three buildings of the service-technical territory. Work is carried out ahead of schedule on average by one month. |
| 05.22.2017 | On the airfield completed all concrete work: taxiways, apron, berths for ships, the runway. Also ready: technical water supply, electricity and gas supply, communication lines. The entrance from the federal highway M-4 “Don” was completed by 81%, the road from the Northern bypass of Rostov was 56% ready [44] . | In September, it is planned to fly around the airfield for its certification, by October, completion of installation and commissioning of technological equipment. |
| 09/25/2017 | The production and domestic building, the warehouse of material and technical supply, the boiler room, the cynological service premises, the Duty Free warehouses, the warehouse for the construction and repair of special equipment and parking lots, all on-site networks (electricity, heat and water supply, sewerage system) were commissioned. | |
| 11/18/2017 | In the new Rostov airport landed a technical flight with representatives of the Federal Air Transport Agency and journalists [45] . | |
| 12/07/2017 | The official opening ceremony of the airport took place. From 11.00, all flights previously taken by Rostov Airport are served by Platov Airport [46] . | From the same moment, the old airport on Sholokhov Avenue is closed to passengers. |
Infrastructure
The airport building has:
- Multimedia exposition dedicated to the history of the Don Cossacks [47] .
- Fan shop of the football club " Rostov " [48] .
- Souvenir shops.
Multimedia Exposure
December 6, 2017 in the waiting area on the third floor opened the exhibition "Platov and his time." It consists of five multimedia elements, thematically related to ataman M. I. Platov [49] :
- “ Don ” - the “Flight over the Don” movie is broadcast on a 14-meter screen in 16K resolution.
- “ Free South ” - short films on free Cossack life are shown on a closed panoramic screen.
- “ The War of 1812 ” is a picture of one of the battles of the campaign of 1812-1814, which comes to life when viewed through a special video finder.
- " Through the ages " - interactive images on the transformation of the form of the Cossacks over several centuries are demonstrated on a large LCD screen.
- " Fractal portraits " - images of ataman Matvey Platov and Field Marshal Mikhail Kutuzov , made on the glazing of the air terminal from various historical quotes.
Performance Indicators
Record daily passenger traffic recorded June 23, 2018 during the World Cup 2018 [50] . On this day, 212 take-off and landing operations were performed. The maximum rate was reached, including landing at the Boeing 777 with 442 passengers on board, the first in the history of the landing airport double-deck Boeing 747, as well as 17 Airbus-319, 17 Airbus-320, 8 - Airbus-321, 11 - Boeing 737 -800.
| Year | Passengers transported (million) | Change to previous year | On the inter- folk lines (million) | Change to previous year | On domestic lines (million) | Change to previous year | Share between folk transportation | Tran- star passengers | Share of shipment | Place among the airports of the Russian Federation [51] |
|---|---|---|---|---|---|---|---|---|---|---|
| 2017 [52] | 2,720 [53] | - | 0.637 | - | 2.077 | - | 23.4% | |||
| 2018 | 3.236 [2] | ▲ 19% | 0.764 | ▲ 20.0% | 2,472 | ▲ 19% | 23.6% | 0.0923 [54] ( ▲ +58%) | 2.8% | eleven |
During the first half of 2018, passenger traffic in a number of areas was: Ekaterinburg - 39 thousand passengers, Sochi - 29 thousand, Samara - 17.3 thousand, Antalya - 74 thousand, Tbilisi - 61.5 thousand people, Dubai - 17 thousand [55] . More than half of the transfer passengers in 2018 were passengers of the flight Tbilisi - Rostov-on-Don - Moscow, in second place - Tbilisi - Rostov-on-Don - Yekaterinburg.
In the first half of 2019, the most popular direct destinations were: Moscow, St. Petersburg, Sochi, Simferopol, Yekaterinburg, Makhachkala, Nizhny Novgorod, Ufa, Samara, Kazan, Grozny, Novosibirsk. Passenger traffic of flights passing by Moscow increased by 15.7% compared with the first half of 2018 and amounted to 356.7 thousand passengers [56] .
In May 2019, Prime Minister Dmitry Medvedev visited the Platov airport as part of his working visit to the Rostov region - this is his first visit to the southern aerogavan [57] .
Airline and Destinations
Regular flights from the airport are performed by more than 20 airlines. The geography of flights is very wide and covers Russia, the near and far abroad. The following are the airlines operating at the airport and the destinations they serve:
| Airline | Destinations |
|---|---|
| Azimuth | Moscow (Vnukovo) , St. Petersburg (daily), Novosibirsk , Kaliningrad , Kaluga , Samara , Yekaterinburg (twice a week), Omsk (daily), Sochi (4 times a week), Yerevan (3 times a week) [58] , Mineral Waters [59] Grozny, Makhachkala, Kazan, Ufa, Nizhny Novgorod, Simferopol |
| Alrosa | Seasonal flights: Mirny (via Novosibirsk), Novosibirsk |
| Aeroflot , SkyTeam member | Moscow (Sheremetyevo) |
| Nordavia | St. Petersburg (from April 19, 2019) |
| Victory Aeroflot subsidiary | Yekaterinburg (three times a week), Tbilisi (daily), Moscow (Vnukovo) (daily), St. Petersburg (daily) [60] Seasonal flights: Sochi Gyumri |
| Russia , Aeroflot subsidiary | Moscow (Vnukovo) , St. Petersburg , Orenburg , Simferopol, Tel Aviv [61] |
| Turukhan | Seasonal flights: Makhachkala , Samara (via Makhachkala) |
| S7 Airlines , Oneworld member | Moscow (Domodedovo) , Novosibirsk [62] |
| Ural Airlines | Yekaterinburg , Moscow (Domodedovo) (twice a day), St. Petersburg , Yerevan (5 times a week), Prague (4 times a week), Khujand Seasonal flights: Dushanbe , Simferopol |
| UVT Aero | Krasnoyarsk (Emelyanovo) , Nizhnevartovsk , Chelyabinsk |
| UTair | Moscow (Vnukovo) (three times a day) [63] , Voronezh (twice a week) Seasonal flights: Nizhnevartovsk , Surgut , Frankfurt am Main |
| Yamal | Samara , Tyumen (via Samara), Ekaterinburg (daily) [64] |
| Azur air | Seasonal charter flights: Bangkok (Suvarnabhumi) , Nha Trang , Phuket , Antalya |
| Nordstar Airlines | Seasonal flights: Samara , Norilsk (via Samara) |
| Nordwind Airlines | Seasonal Charter Flights: Heraklion |
| Red Wings Airlines | Moscow (Domodedovo) |
| Royal flight | Seasonal charter flights: Barcelona , Goa , Rhodes |
| Aegean Airlines | Seasonal charter flights: Heraklion , Thessaloniki |
| AZAL | Seasonal flights: Baku |
| Belavia | Minsk |
| Ellinair | Thessaloniki |
| Smart Wings | Prague |
| flydubai | Dubai |
| Uzbekistan Airlines | Tashkent |
| Turkish Airlines | Istanbul |
Транспортная доступность
| External images | |
|---|---|
| Расположение на карте и схема проезда | |
Аэропорт связан автодорогой с северным обходом Ростова-на-Дону и федеральной автодорогой М-4 «Дон» . Проектировщик ОАО «ГипродорНИИ» в 2013 году предоставил шесть вариантов трассировки автодороги. В итоге была выбрана трасса, которая пройдёт по территории Аксайского и Родионово-Несветайского районов с обходом посёлков Октябрьский и Красный , хуторов Каменный Брод и Камышеваха [65] , общая протяженность составляет 15 932,24 м. Участок от северного обхода до аэровокзала — 2-полосный с обочинами, рассчитанными на расширение до 4-х полос (расширение началось летом 2018 года). Участок от М-4 до аэровокзала — 4-полосный. Оба участка полностью освещённые. Построенные участки дорог одновременно сократили и сделали удобным маршрут с М-4 на Таганрог .
Расстояние по автомобильным дорогам до центров крупнейших городов Ростовской области: 26 км до Новочеркасска ; 40 км до Ростова-на-Дону ; 42 км до Шахт ; 46 км до Новошахтинска ; 50 км до Батайска ; 80 км до Азова ; 100 км до Таганрога .
Общественный транспорт к аэропорту представлен лишь 17-местными микроавтобусами (обычными маршрутками) № 285 и № 286:
- следование по маршруту № 285: Привокзальная площадь — Гвардейская площадь — улица Красноармейская — проспект Театральный — проспект Шолохова — трасса М-4 «Дон» — аэропорт Платов;
- следование по маршруту № 286: Сельмаш — улица Менжинского — улица Курчатова — улица Щербакова — Вятская улица — Орская улица — Щепкинское шоссе — аэропорт Платов [66] .
Рейсы выполняются круглосуточно, с интервалом 30 минут (каждые 00 и 30 минут часа). Время в дороге от железнодорожного вокзала Ростова-на-Дону (место отправления маршрутных такси) до аэропорта около одного часа.
C 2019 года из Ростова-на-Дону в аэропорт организован маршрут № 700, из Новочеркасска — маршрут № 800 [67] .
Ранее озвученные планы строительства железнодорожной ветки и запуска «Донского экспресса» [68] не подтвердились. Областной минтранс озвучил планы запуска электрички до аэропорта в 2035 году [69] .
- Дорожные указатели относительно трассы М-4 «Дон»
Въезд с М-4 со стороны Москвы
Выезд на М-4 в сторону Ростова-на-Дону и ответвление на Таганрог
Security
Airport "Platov" is the best Russian airport in terms of transport security [70] . It operates the most modern equipment used for inspection, and safety indicators meet the requirements of the standards of the European Conference of Civil Aviation. For inspection of luggage used tomographs manufacturer Morpho Detection . The baggage conveyor allows you to inspect 1,800 pieces of luggage in one hour [71] .
Photo Gallery
Airport building, November 2017
Airport building in the evening, December 2017
Check-in counters, December 2017
Fanshop FC Rostov, December 2017
Interior premises, December 2017
Interior premises, December 2017
Escalator, December 2017
See also
- Rostov-on-Don Airport
- List of airports in Russia
- List of the busiest airports in Russia
Notes
- ↑ 1 2 3 “Platov” is open: the “Cossack” airport took the first flight . vesti.ru. The appeal date is December 8, 2017.
- ↑ 1 2 Passenger traffic on interregional flights grew by 66% . rov.aero. The appeal date is January 30, 2019.
- ↑ Rostov airport Platov began to take regular flights . RBC. The appeal date is December 8, 2017.
- ↑ Less ambitious airports in recent years built in Russia in Sabetta , Bovanenkovo , Talakan .
- ↑ Mass media: The first airport built in Russia from scratch will become the most expensive . www.dp.ru. The appeal date is December 8, 2017.
- ↑ PLATOV Airport -> About Airport -> Airport Description -> Aerodrome Characteristics . Airport fees. The appeal date is December 8, 2017.
- ↑ CERTIFICATE OF CONFORMITY
- ↑ Platov became the first airport in Russia to receive 5 stars Skytrax
- ↑ Platov Airport received the highest rating from a reputable international agency
- ↑ Rostov News Agency - news of Rostov and the region . www.donnews.ru. The appeal date is February 14, 2018.
- ↑ Platov International Airport in Rostov-on-Don. Dossier , tass . The appeal date is February 14, 2018.
- ↑ Ordinance dated January 20, 2017 No. 46-p . January 23, 2017 . Government of the Russian Federation. The appeal date is March 9, 2017.
- ↑ Platov International Airport in Rostov-on-Don. Dossier . Tass The appeal date is January 30, 2019.
- ↑ The man who invented the new Rostov airport "Platov" . Site of the city of Rostov-on-Don (February 2, 2017).
- ↑ https://www.favt.ru/dejatelnost-ajeroporty-i-ajerodromy-reestr-grajdanskih-ajerodromov-rf/
- ↑ Airports and their operation
- ↑ German ThyssenKrupp will supply terapraps airport under construction Platov . Tass The appeal date is January 30, 2019.
- ↑ Objects - Platov Airport (not available link) . www.platov.aero. The appeal date is April 28, 2017. Archived May 6, 2017.
- ↑ The plan for commissioning the airport Platov - Airport Platov approved . platov.aero. The appeal date is April 28, 2017.
- ↑ Holding "Airports of the Regions" . www.ar-management.ru. The appeal date is January 30, 2019.
- ↑ Master Plan of the Grushevsky Rural Settlement (Not available link) . Circulation date December 21, 2013. Archived December 24, 2013.
- ↑ Resolution of August 16, 2012 No. 777 . www.donland.ru. The appeal date is January 30, 2019.
- ↑ Election of heads of urban and rural settlements and representative bodies of local self-government (Inaccessible link) . The date of circulation is December 21, 2013. Archived on February 1, 2016.
- ↑ Dmitry Medvedev doubts the feasibility of building the South Airport for the 2018 World Cup . www.donnews.ru. The appeal date is January 30, 2019.
- ↑ Placing order №0158200002813000009
- ↑ Announcement of the winner of the request for quotations
- ↑ Asked to win? gorodn.ru. The appeal date is January 30, 2019.
- ↑ What will be the "Southern" ?, Rostov-on-Don - Business District . rostov.dk.ru. The appeal date is January 30, 2019.
- ↑ Public hearings on the project of planning and land surveying of land plots (inaccessible link) . Circulation date December 21, 2013. Archived December 24, 2013.
- ↑ Vasily Golubev, Maxim Sokolov and Viktor Vekselberg signed an agreement on the Yuzhny airport complex . www.donland.ru. The appeal date is January 30, 2019.
- ↑ Vasily Golubev: “The project of a new airport is in the interests of the future” . www.donland.ru. The appeal date is January 30, 2019.
- ↑ A criminal case was instituted against the president of the Avers group of companies in connection with the attempted commercial bribery and complicity in it (not available link) . Circulation date December 21, 2013. Archived December 24, 2013.
- ↑ The next meeting of land share owners (inaccessible link) . The date of circulation is December 21, 2013. Archived on February 1, 2016.
- ↑ Construction of the airport terminal "Yuzhny" will begin in May 2015. RBC. The appeal date is January 30, 2019.
- ↑ The general contractor for the construction of the airport “Yuzhny” selected . www.rostov.aif.ru (June 19, 2015). The appeal date is January 30, 2019.
- ↑ Alexander Seversky. Rostov-on-Don with the airport complex "Yuzhny" plan to link the high-speed trams . kp.ru. Komsomolskaya Pravda (August 25, 2015). The appeal date is January 30, 2019.
- ↑ The first 200 piles (AviaPort) driven into the base of the passenger terminal of the new South Airport complex . AviaPort.Ru. The appeal date is January 30, 2019.
- ↑ The name of the airport complex “Yuzhny” will be chosen by the residents of the Rostov region . www.donnews.ru. The appeal date is January 30, 2019.
- ↑ 1 2 Victor Govorov. The runway of the new Rostov airport is ready by 81% . rostov.kp.ru . Komsomolskaya Pravda (June 23, 2016). The appeal date is January 30, 2019.
- ↑ In Rostov, we finished building the runway at the Platov Airport . RBC. The appeal date is January 30, 2019.
- ↑ The runway for Yuzhny Airport is fully built . Business newspaper. News of Rostov-on-Don. The appeal date is January 30, 2019.
- ↑ ROSTOV-ON-DON Airport -> The readiness of the passenger terminal of the new Platov Airport exceeds 60% . Airport ROSTOV-ON-DON. The appeal date is April 28, 2017.
- ↑ Until the completion of the construction of the Platov airport complex, less than 100 days remain - Platov Airport . platov.aero. The appeal date is April 28, 2017.
- ↑ The federal component of the Rostov Platov Airport is 100% fulfilled . Business newspaper. News of Rostov-on-Don. The appeal date is January 30, 2019.
- ↑ Russia 24. The first aircraft landed at the new Rostov airport . youtube.com (November 18th, 2017). The appeal date is January 30, 2019.
- ↑ The procedure for transfer of flights new airport
- ↑ Mail ru News. In the Rostov airport "Platov" opened a multimedia exposition . Mail.ru News. The appeal date is January 30, 2019.
- ↑ At the airport, Platov solemnly opened the fanshop of FC “Rostov” - DONTR.RU Neopr . dontr.ru. The appeal date is January 30, 2019.
- ↑ “Exclusive charm”: a museum was opened at Platova airport . www.donnews.ru. The appeal date is January 30, 2019.
- ↑ The official website of the airport Platov Rostov-on-Don
- Format: a place in the rating for full passenger traffic (for international traffic; for domestic traffic)
- ↑ Statistics from January 1 to December 7 - for the old airport , from December 7 to December 31 - for the new one.
- ↑ The volume of traffic through the airports of Russia in January-December 2016-2017. (inaccessible link) . Rosaviatsia . The appeal date is March 28, 2018. Archived March 28, 2018.
- ↑ https://travel.rambler.ru/news/41612970/?utm_content=rtravel&utm_medium=read_more&utm_source=copylink
- ↑ Airport "Platov" expanded the route network by a third - Expert South . expertsouth.ru. The appeal date is January 30, 2019.
- ↑ The growth of direct inter-regional traffic from Platov Airport in the first half of 2019 was 16% . rov.aero. The appeal date is July 15, 2019.
- ↑ Mail.ru News. A tour of the Rostov Platov Airport was conducted for Dmitry Medvedev . Mail.ru news. The appeal date is July 15, 2019.
- ↑ Flight Geography Azimuth Airlines
- ↑ From Mineralnye Vody to Rostov-on-Don for 888 rubles
- Побед Pobeda Airlines, Aeroflot Group - Flight Schedule
- ↑ Airline "Russia" - schedule
- ↑ S7 Airlines flight schedule
- ↑ Flights
- ↑ Airline "Yamal" will launch flights between Rostov and Yekaterinburg
- ↑ The access road to the airport “Yuzhny” will not affect elite farms . www.donnews.ru. The appeal date is January 30, 2019.
- ↑ Buses No. 285 and No. 286 will travel to Platov Airport . don24.com The appeal date is July 15, 2019.
- ↑ Public transport in Platov Rostov-on-Don . rov.aero. The appeal date is July 15, 2019.
- ↑ Rostov and Platov can connect the railway “Donskoy Express” . The appeal date is December 8, 2017.
- ↑ Mail ru News. After 17 years at the airport Platov promise to start the train . Mail.ru News. The appeal date is January 30, 2019.
- ↑ Medals to passengers and caviar for 30 thousand: a new air harbor opened in Rostov . The appeal date is December 8, 2017.
- ↑ Platov Airport will become an attractive platform for investors . runews24.com. The appeal date is June 16, 2017.
Links
- Official site
- Rostov-on-Capote: on the minibuses to the airport "Platov" corrected the panorama of the city
- Platov Airport - how to get there by bus
- Public transport to the airport Platov
- Russian Transport Minister and Don Governor awarded Platov airport builders
- Unique "Sportolet" visited the airport Platov in Rostov-on-Don