The European route E125 is a Category A automobile European automobile route , passing from north to south through Russia , Kazakhstan and Kyrgyzstan and connecting the cities of Ishim , Astana and Bishkek [1] [2] .
| Highway | ||
| European route E125 | ||
|---|---|---|
European route E125 | ||
| basic information | ||
| A country | ||
| Length | ± 2600 | |
| Start | Ishim | |
| Through | Petropavlovsk , Astana , Karaganda , Alma-Ata , Bishkek | |
| the end | Torugart | |
Content
Route
- Russia
- E 22 E 30 Ishim
- Kazakhstan
- E 019 Petropavlovsk
- Kokshetau
- Schuchinsk
- E 016 Astana
- E 018 Karaganda
- Balkhash
- Burubaital
- E 40 E 012 Alma-Ata
- Kyrgyzstan
- E 40 Bishkek
- Naryn
- Torugart [1] [3] (border with China )
On a 217-km stretch between Astana and Schuchinsk, it is a toll motorway. For cars - 1 tenge / km, up to 29 tenge per kilometer for trucks [4] . The permitted speed is 140 km / h [5] .
Pavement
The quality of the road surface:
- Astana - Schuchinsk 1st category road six-lane with a separator. [6]
History
Reconstruction of the Astana-Schuchinsk highway began in 2006. and lasted 3 years, the road was put into operation in 2009. [7]
Paid fare on the Astana - Schuchinsk section was introduced in 2013. [4] [8] .
2013-2016 The reconstruction of the Astana – Temirtau and Almaty – Kapshagay roads [9] has begun. In 2017-2018 reconstruction of the Temirtau-Karaganda road. [ten]
In 2017 The reconstruction of the Kokshetau-Petropavlovsk section has been completed [11]
In the second quarter of 2018, sections Astana - Temirtau, Almaty - Kapshagai will become paid [12]
In 2018, it is planned to start the Balkhash-Burylbaital (297 km) section at the expense of the World Bank and Kurt-Kapshagai (67 km), Karaganda-Balkhash (364 km) in 2019. [13]
Notes
- ↑ 1 2 UNECE document ECE / TRANS / SC.1 / 384 "Road Transport Infrastructure"
- ↑ Cargo transportation to Kyrgyzstan transportation Kyrgyzstan cargo delivery . www.tk-otvozim.ru. Date of treatment August 9, 2016.
- ↑ Map of E-road network - UNECE document (2007)
- ↑ 1 2 Free roads will pay all
- ↑ The first Kazakhstan highway “Astana-Borovoye” will be paid in a year. ”Kazakhstan news, all the latest Russian news and world news, news of the day
- ↑ Tariffs approved for travel on the toll road "Astana - Schuchinsk"
- ↑ Autobahn Astana-Schuchinsk
- ↑ Three tracks in Kazakhstan until the end of the year will be paid
- ↑ Astana-Karaganda highway will be opened before the end of 2017
- ↑ The reconstruction of the Temirtau-Karaganda highway section will be completed in 2018
- ↑ In northern Kazakhstan, the reconstruction of the Kokshetau-Petropavlovsk transport corridor was completed
- ↑ Roads Astana - Temirtau and Almaty - Kapshagai will be paid in the second quarter of 2018
- ↑ GETTING STARTED RECONSTRUCTION OF THE KURTA-BURYLBAYTAL ROAD SECTION 228 KM CENTER-SOUTH PROJECT