| Beijing - Harbin | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Line length: | 1700 km | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Track: | 1435 mm | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Voltage: | 50Hz 25,000V = | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Maximum speed: | 350 km / h | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Legend
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Beijing-Harbin high-speed passenger line ( Chinese trade. 京 哈 客運 專線 , control 京 哈 客运 р , pinyin : Jīng-Hā Kèyùn Zhuān Xiàn , also called the Jinghai express line) is a large-scale project for organizing direct connections between major cities China's and provincial centers, connecting the capital of Beijing , the capital of Liaoning, Shenyang , the capital of Jirin, Changchun and the capital of Heilongjiang, Harbin . The line also includes branches covering the large cities of Dalian , Anshan , Panjin , Yingkou . In parallel with the main highway, another high-speed Tianjin - Qinhuangdao - Shenyang highway is also being built.
The length of the line is 1700 km. Designed for train speeds of 350 km / h.
The project is part of a global project to build a network of high-speed railways in China , the main part of which corresponds to the 4 + 4 formula - four high-speed lines from north to south, and four from east to west. The road is being constructed in stages, the first of which are expected to be commissioned in 2012. [one]
Part of the Qinhuangdao - Shenyang parallel route has already been commissioned.
Track Structure
This line includes the main route from Beijing - Shenyang - Changchun - Harbin , the Shenyang - Dalian branch and the Panjin - Yingkou connecting branch, departing from the station from this branch of Xichang - West (in front of Yingkou ) to the city of Panjin , where it connects with the Qinsheng railway .
- High-speed railway Beijing - Shenyang (676 km), through Chengde and Chaoyang , construction started in 2009, commissioning expected in 2014)
- Harbin - Dalian High Speed Railway (904 km), continuing the main route on the section
Shenyang - Changchun - Harbin , and including the Shenyang - Dalian branch through Anshan and Yingkou - construction began on August 23, 2007, commissioning is expected in July 2012
- Panjin-Yingkou High Speed Railway (90 km), construction started on May 21, 2009, launched in September 2013.
In parallel with this line between Beijing and Shenyang, another high-speed Tianjin - Shenyang highway is being built:
- Tianjin - Qinhuangdao High Speed Railway (261 km) - the project was delayed due to the sanctions of the Ministry of Environmental Protection , and was put into operation on December 1, 2013.
- Qinsheng Railway (404 km) from Qinshuangdao to Shenyang , the first high-speed railway, launched in 1999 and opened in 2003
Connections
In Beijing, the road continues on to the transition to the Beijing-Shanghai High-Speed Railway , which connects Beijing with the city of Tianjin .
See also
- High Speed Rail in China