Okskaya is a Moscow metro station under construction on the Nekrasovskaya line . Located in the Ryazan region ( SEAD ), named after the street of the same name . The opening is scheduled for 2020 as part of the Nizhny Novgorod - Kosino section [1] . Small columned three-span station with two coastal platforms.
| Okskaya | |
|---|---|
Nekrasov line | |
| Moscow subway | |
Station project | |
| Area | Ryazan |
| County | SEAD |
| Estimated Opening Date | 2020 [1] |
| Design name | Okskaya street |
| Type of | three-span pillar shallow [2] [3] |
| Number of platforms | 2 |
| Type of platforms | coastal |
| Exit to the streets | Okskaya , Ryazansky Prospect , Papernika , 1st Novokuzminskaya |
| Nearby Stations | and |
Content
Construction
The construction of the Nekrasovskaya metro line was promised to begin in 2012 [4] [5] . However, in 2013 , the station came under redesign by the Spanish company Bustren.
The fencing of the construction site of the station began in March 2015 . From April 5, 2017, for the construction of the station, the section of 1st Novokuzminskaya street from the intersection with Okskaya street to 6k2 house and the section of Okskaya street from the intersection with Ryazansky Prospekt to 28s1 along Ryazansky Prospekt [6] are completely closed for vehicles.
- December 13, 2017 . Tunneling with a diameter of 10 meters began from the Okskaya Street station to the Nizhny Novgorod Street station. The shield has to overcome 3336 meters, with a stop in the foundation pit of the Stakhanovskaya station [7] .
- December 13, 2018 . A double-track tunnel between Okskaya Street and Stakhanovskaya was completed. Next, the shield will go through reorganization and dig a tunnel to the "Nizhny Novgorod" [8] .
Location and Lobby
| External Images | |
|---|---|
| Layout of Okskaya Street Station | |
| Ground Pavilion Project | |
The station will be located at the junction of Okskaya Street to Ryazansky Prospekt [9] . One lobby is planned with exits to Ryazansky Prospekt and to Okskaya Street [10] .
Architecture and Design
Small columned three-span station with two coastal platforms.
The main colors in the decoration of the station will be blue, gray and black. The station ceiling will be lined with dark blue aluminum panels with a print , against which luminous rings will be placed, due to which it is planned to achieve the effect of circles on the water. The floor will be covered with light gray granite; the walls of the station, lobby and passages are lined with porcelain stoneware of the same tone [10] .
See also
- List of Moscow metro stations
Notes
- ↑ 1 2 About 33 km of metro lines will be built in Moscow before the end of the year . stroi.mos.ru. Date of treatment March 31, 2019.
- ↑ Surikov A. Okskaya street . Metrostroy. Date of treatment November 17, 2011. Archived November 23, 2012.
- ↑ Surikov A. Kozhukhovskaya line . Metrostroy. Date of treatment November 17, 2011. Archived on June 8, 2012.
- ↑ Building World - 10/17/2011. The metro will reach the Lyubertsy fields in 2012 (inaccessible link)
- ↑ They promise to extend the metro to Lyubertsy fields by 2015 . msk.newsru.com. Date of treatment March 31, 2019.
- ↑ Information service of the Stroykompleks portal. On several streets of Moscow, traffic was limited . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (April 5, 2017). Date of treatment April 5, 2017.
- ↑ Nekrasovskaya line: "Nekrasovka" - "Nizhny Novgorod Street" - Our transport . forum.nashtransport.ru. Date of treatment March 31, 2019.
- ↑ The second double-track tunnel was built on the Nekrasovskaya metro line . stroi.mos.ru. Date of treatment March 31, 2019.
- ↑ SLC approved the design project for the linear metro facility from Aviamotornaya station to the Kosino-Ukhtomsky district . Moskomstroyinvest (September 13, 2012). Date of treatment October 2, 2012. Archived October 24, 2012.
- ↑ 1 2 Olga Zenevich. Stations of Kozhukhovskaya metro line: magma stones, Lego constructor and lunar road . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (February 6, 2018). Date of treatment February 7, 2018.