Aviamotornaya is a station under construction on the Big Ring Line of the Moscow Metro. It will be connected by a transfer with the station of the same name on the Kalinin line . It will be located in the Lefortovo region ( SEAD ) along the Enthusiasts passage . It is planned to open the station in 2020 as part of the Nizhny Novgorod - Lefortovo section [1] , which will function as an extension of the Nekrasov line [5] .
| "Aviamotornaya" | |
|---|---|
Large circle line Nekrasov line | |
| Moscow subway | |
Station project | |
| Area | Lefortovo |
| County | SEAD |
| Estimated Opening Date | 2020 [1] |
| Type of | three-span pillar shallow [2] [3] |
| Number of platforms | one |
| Platform type | island |
| Platform shape | straight |
| Architects | A. L. Vigdorov , A. B. Ostrovsky, S. V. Karetnikov |
| Station builds | JSC Mosmetrostroy [4] |
| Transitions at the station | |
| Exit to the streets | Aviamotornaya Street , Enthusiast Highway |
| Nearby Stations | and |
Previously, it was planned to build a station as part of the Nekrasov line, and then transfer it to the Great Ring Line [6] .
Content
Design
The first project to build a chord line with a junction at the Aviamotornaya station appeared in 1985. This project has been repeatedly corrected [3] .
In February 2011, it announced plans to build a new Kozhukhovskaya line from Aviamotornaya [7] . According to the initial project, it was supposed to make the “Aviamotornaya” deep station. In November 2011, the plans were adjusted, and it was decided to build a shallow station [3] . It is also planned that the Aviamotornaya station will be part of the transport and interchange hub [8] .
In April 2012, it was announced that the Kozhukhovskaya line could be extended from Aviamotornaya to the city center [9] .
Construction
To free the site for the construction of the station and the interchange hub, the Lefortovo market was closed and demolished [10] .
The construction of the Kozhukhovskaya metro line was promised to begin in 2012 [11] . As of May 2014, drilling operations related to engineering and geological surveys are being carried out geographically at the site of the future station.
In February 2017, the construction of the northern lobby began [12] .
In mid-September 2017, tunneling of the left distillation tunnel between the Lefortovo and Aviamotornaya stations was started [13] . The passage of the right distillation tunnel from Lefortovo station towards Aviamotornaya began in mid-October 2017 [14] .
On July 31, 2018, the right distillation tunnel from Lefortovo Station to Aviamotornaya Station was completed [15] [16] . The passage of the left distillation tunnel was completed on August 8, 2018.
September 4, 2018 . The sinking of the left distillation tunnel from Aviamotornaya to Nizhny Novgorod has been completed.
September 14, 2018 . The completion of the right distillation tunnel from Aviamotornaya to Nizhny Novgorod has been completed.
October 15, 2018 . The start of the right distillation tunnel from platform 25.3 to Aviamotornaya began [17] . The passage of the left distillation tunnel started on November 16, 2018.
April 1, 2019. Specialists began the construction of an inclined tunnel for escalators at the station [18] .
June 13, 2019 . The right distillation tunnel between the Nizhny Novgorod and Aviamotornaya stations was completed [19] .
July 25, 2019. The finishing of the platform of the Aviamotornaya station began, and in parallel, subsystems for aluminum rack panels are mounted on the track walls. The main plant designs are 77% complete. Waterproofing and installation of escalators in the south lobby are ongoing. In the distillation tunnels to the Lefortovo station, a running rail was mounted [20] .
Location and Lobby
| External Images | |
|---|---|
| Layout plan of the Aviamotornaya station | |
The station is located in a place that was previously occupied by the Lefortovo market and the Mosgortrans traction electrical substation [6] [21] .
Will have two vestibules. The northern lobby will be connected to the station with a perpendicular approach corridor under the railway tracks and four escalators and have access to the intersection of Aviamotornaya and Krasnokazarmennaya streets. The southern lobby will be located on the site of the Entuziastov Passage tram terminal station [22] and will be connected to the station by four escalators.
At the base of the station, a transport hub will be built. It will include two metro stations, the Novaya railway platform of the Kazan and Ryazan directions of the Moscow Railway, as well as public transport stops. Putting into operation of the TPU technological part is planned simultaneously with the opening of the station, at the end of 2018 [6] , the TPU commercial part is planned to be opened in mid-late 2019. It will include 10-15 storey buildings with offices and apartments, as well as 10 thousand m² of retail space, which will be a modern alternative to the previously located market [21] .
Architecture and Design
| External Images | |
|---|---|
| Project of the Aviamotornaya BKL station | |
The design of the station is a three-span shallow pillar. In the center of the hall, the transition to the Kalinin line will begin [2] .
See also
- Nekrasov line
- List of Moscow metro stations
- Moscow Metro Development Program
Notes
- ↑ 1 2 About 33 km of metro lines will be built in Moscow before the end of the year . stroi.mos.ru. Date of treatment March 31, 2019.
- ↑ 1 2 Surikov A. Aviamotornaya-II . Metrostroy. Date of treatment October 11, 2012. Archived October 27, 2012.
- ↑ 1 2 3 Surikov A. Kozhukhovskaya line . Metrostroy. Date of treatment November 17, 2011. Archived on June 8, 2012.
- ↑ Information service of the Stroykompleks portal. At the construction site of the Sheremetyevskaya metro station, the ground will be frozen . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (October 26, 2017). Date of appeal October 27, 2017.
- ↑ BCL stations of the Lefortovo and Aviamotornaya metro stations will be introduced in 2019 - Khusnullin . stroi.mos.ru. Date of treatment January 4, 2019.
- ↑ 1 2 3 Olga Completedneva. The metro TPK section from the Rubtsovskaya station to Aviamotornaya will be launched at the end of 2018 . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (August 19, 2017). Date of treatment August 20, 2017.
- ↑ Moscow begins to build a third metro radius . Date of treatment May 20, 2018.
- ↑ Metro will not reach Solntsev? . Moscow Komsomolets (September 7, 2012). Date of treatment September 26, 2012. Archived October 27, 2012.
- ↑ The designed Kozhukhovskaya metro line can be extended to the center of the capital . newsmsk.com (April 27, 2012). Date of treatment November 2, 2012. Archived November 23, 2012.
- ↑ Lefortovo market closes in the coming days - Khusnullin . stroi.mos.ru. Date of treatment May 20, 2018.
- ↑ They promise to extend the metro to Lyubertsy fields by 2015 . newsmsk.com. Date of treatment May 20, 2018.
- ↑ The construction of the northern lobby of the Aviamotornaya station of the Second Metro Ring Began . stroi.mos.ru. Date of treatment May 20, 2018.
- ↑ The start of the left distillation tunnel from the Lefortovo station to the Aviamotornaya station of the Third Interchange Circuit (VIDEO) . www.mosinzhproekt.ru. Date of treatment May 20, 2018.
- ↑ Information service of the Stroykompleks portal. Tunneling began between the Lefortovo and Aviamotornaya metro stations at TPK . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (October 19, 2017). Date of appeal October 19, 2017.
- ↑ Khusnullin: a tunnel between the Lefortovo and Aviamotornaya metro stations on the BCL was built . stroi.mos.ru (July 31, 2018). Date of treatment August 1, 2018.
- ↑ Chernyavskaya, Vasilisa Andrei Bochkarev: In five years we’ll build a metro line that has no analogues in the world . Evening Moscow (August 1, 2018). Date of treatment August 1, 2018.
- ↑ The construction of the second part of the BCL tunnel of the metro from Nizhny Novgorod to Aviamotornaya began
- ↑ At the BKL station of the Aviamotornaya metro station, they began to build a tunnel for escalators . stroi.mos.ru. Date of treatment April 1, 2019.
- ↑ Khusnullin: another tunnel was built on the Big Ring of the metro . stroi.mos.ru. Date of treatment June 15, 2019.
- ↑ Platform finishing began at the Aviamotornaya station of the BKL metro (English) . icmos.ru. Date of treatment July 25, 2019.
- ↑ 1 2 Olga Zakonovneva. TPU Aviamotornaya is scheduled to open in 2018 . stroi.mos.ru . Complex urban planning policy and the construction of the city of Moscow (August 19, 2017). Date of treatment August 20, 2017.
- ↑ Muscovites approved the new route of the Kozhukhovskaya metro line . newsmsk.com (October 13, 2012). Date of treatment November 2, 2012. Archived November 23, 2012.