Stroygazconsulting is a Russian company specializing in construction and engineering. SGK conducts the development of oil and gas condensate fields , construction and overhaul of pipelines, roads.
| LLC Stroygazconsulting | |
|---|---|
| Type of | Limited liability company |
| Base | 1996 year |
| Location | |
| Industry | Construction, repair, reconstruction |
| Turnover |
|
| Number of employees | 25 thousand (2017) |
| Website | www.sgc.ru |
The total number of specialists working at the company's enterprises exceeds 25 thousand people [2] . The fleet of machines and mechanisms has more than 14 thousand units of equipment. [3]
Content
- 1 History
- 2 Owners and management
- 3 Activities
- 4 Mechanical
- 5 notes
- 6 References
History
The company was founded in 1996. [4] [5] [6] [7]
In 2016, Stroygazconsulting LLC, among the three main contractors of Gazprom PJSC, together with Stroygazmontazh LLC and StroyTransNefteGaz JSC, signed a memorandum on the establishment of the Association of Gas Industry Construction Organizations. [8] [9]
Owners and management
The company is controlled by Gazprombank and the UCP investment fund, in equal shares - 50% each. [10]
General Director - Levina Larisa Anatolyevna. [eleven]
Activities
Among the projects that have been successfully completed or are underway:
- arrangement of the Kharvutinsky and Aneryakhinsky areas of the Yamburgskoye gas and condensate field , Pestsovaya square of the Urengoy oil and gas condensate field , Nakhodkinsk oil and gas condensate field , the Kirinsky oil and gas condensate field [12] , the Bovanenkovsky oil and gas condensate field , the Kharasavey gas and condensate field . [13]
- the construction of the Portovaya compressor station of the Gryazovets-Vyborg MG [13] , the head compressor station of the Zapolyarnoye oil and gas condensate field, compressor stations at the TsPS-1 and TsPS-2 of the Urengoy oil and gas condensate field, compressor stations at the Bovanenkovo-Ukhta and the Ukhta-Torzhok SMG .
- the construction of the Power of Siberia gas main pipelines [14] [15] , Bovanenkovo-Ukhta , Ukhta-Torzhok, Gryazovets-Vyborg, Sakhalin-Khabarovsk-Vladivostok , and the East Siberia-Pacific Ocean pipeline system ( ESPO-2 oil pipeline ) [16] , the Zapolyarye –PS Pur-Pe pipeline system, the onshore section of the Nord Stream offshore gas pipeline (Russian sector) [17] [18] , the gas pipeline branch to the cities of Arkhangelsk and Severodvinsk .
- construction of the Kolyma Federal Highway [19] , a new exit onto the Moscow Ring Road from the M-1 Moscow-Minsk Federal Highway , the Vorkutinskaya – Yarynskaya KS highway, technological and long-distance passages of the East Siberia – Pacific Ocean pipeline system , roads “Teriberka - LNG plant” (as part of the integrated development of the Shtokman gas condensate field ), viaducts on federal highways A103 , A107 and A108 , the first launch complex of the Central Ring Road of the Moscow Region . [20] [21] [22]
- construction of the Obskaya - Bovanenkovo railway [23] , the Zamoskvoretskaya line of the Moscow metro from the station “River Station” to the station "Khovrino" [24] [25] [26] , the integrated development of the Murmansk transport hub . [27] [28] [29]
- construction of administrative buildings, sports facilities, residential buildings, hostels and hotels in cities and towns of the Far North and other regions of Russia.
Arms
The technical equipment of Stroygazconsulting includes more than 14,000 units of equipment: GAZ , KamAZ , Ural , Mercedes , Liebherr , Caterpillar , Komatsu , KATO , Hitachi , JCB . [3] [30]
Notes
- ↑ Rating of the largest Russian companies by sales volume - Expert RA .
- ↑ People of SGK . www.sgc.ru. Date of treatment September 28, 2017.
- ↑ 1 2 Interview - Ziyad Manasir, president of Stroygazconsulting // Bela Lyauv, Elena Khodyakova, Vedomosti.ru, 10.28.2013
- ↑ Friend of families // Maria Abakumova, Russian Forbes, March 2009, Gazprom Contracts.
- ↑ Gazprom does not abandon its own // Elena Mazneva, Vedomosti , 09/10/2009.
- ↑ Ziyad Manasir: I Consider Russia Homeland // Economic Strategies, No. 5-6 (63-64), 2008.
- ↑ “There are no quick decisions in Gazprom”, - Ziyad Manasir, President of Stroygazconsulting // Irina Reznik, Julia Govorun, Vedomosti , No. 207 (2477) dated November 2, 2009 ( original material ).
- ↑ Gazprom and large construction companies agreed to create an Association of gas industry construction organizations . www.gazprom.ru. Date of treatment September 28, 2017.
- ↑ Gazprom agreed with major contractors to create an association , RBC . Date of treatment September 28, 2017.
- ↑ http://www.vedomosti.ru/business/articles/2015/04/17/gazprombank-i-fond-ucp-ili-scherbovicha-kupili-100-stroigazkonsaltinga "Gazprom contractor bought for two" // Vedomosti No. 3814 dated 04/17/2015
- ↑ Stroygazconsulting, LLC, St. Petersburg TIN 7703266053 | Details, legal address, checkpoint, PSRN, location map, website, e-mail, phone - find out on sbis.ru . VLSI. Date of appeal September 11, 2019.
- ↑ Stroygazconsulting won a contract for the construction of the coastal complex of the Kirinsky deposit , sakhalin.info . Date of treatment September 28, 2017.
- ↑ 1 2 Captive of obligations: what went wrong in the business of Gazprom's favorite Ziyad Manasir // Irina Malkova, Maria Abakumova, Russian Forbes, 02.24.2014, Billionaires
- ↑ Sheets . Gazprom has given the contract for the Power of Siberia site to Stroygazconsulting (September 6, 2016). Date of treatment September 28, 2017.
- ↑ Gazprom for the first time since 2013 gave a major contract to Stroygazconsulting , RBC . Date of treatment September 28, 2017.
- ↑ Transneft put into operation the second phase of ESPO // RIA Novosti, December 25, 2012
- ↑ Onshore and offshore sections of the first string of the Nord Stream gas pipeline will connect in August 2011 // Oil and Gas Russia, Energyland, 03/04/2011
- ↑ Nord Stream AG will begin exporting gas to Germany in 2011 // RIA Novosti, May 6, 2010
- ↑ Information for road users on the federal highway “Kolyma” Yakutsk - Magadan // Portal of the city of Khabarovsk, June 2, 2013
- ↑ Avtodor and Stroygazconsulting signed an agreement on the construction of the first stage of the Central Ring Road // ITAR-TASS, May 23, 2014, Economics and Business
- ↑ Avtodor and Stroygazconsulting signed an agreement on the TsKAD site // RIA Novosti, May 23, 2014
- ↑ The Manasira company signed a contract for the construction of the Central Ring Road // Denis Ilyushenkov, Anatoly Temkin, RBC, May 23, 2014, Consumer Market
- ↑ Railroad works at the Bovanenkovo field are insured for 1 billion rubles // Neftegaz, October 31, 2012, News. Transportation and Storage
- ↑ Builders moved by metro // Bela Lauv, Vedomosti, 01/13/2014, 1 (3505)
- ↑ Billionaire Ziyad Manasir will participate in the construction of the Moscow metro // ITAR-TASS, July 25, 2013
- ↑ Still Green // Andrei Makarsky, Moscow Perspective, 03/04/2014
- ↑ Stroygazconsulting will build the Murmansk transport hub // IIS “Metal Supply and Sales”, April 3, 2014
- ↑ “Rosneft” defended Murmansk // Julia Gallyamova, Anna Solodovnikova, Kommersant ”No. 72 dated 04.25.2014, p. 11
- ↑ Murmansk transport hub will cost Stroygazconsulting // IA REGNUM, 03/13/2014
- ↑ Mechanical equipment of Stroygazconsulting LLC
Links
- Official website of Stroygazconsulting LLC
- SGK official page on the social network Facebook
- SGK official page on the VKontakte social network
- “There are no quick decisions at Gazprom,” Ziyad Manasir, president of Stroygazconsulting
- Website of VNIIGAZ LLC
- Forbes Rating
- Forbes Magazine "100 richest businessmen of Russia"
- The film is about the construction of trunk pipelines. By the example of the Sakhalin-Khabarovsk-Vladivostok gas pipeline and the East Siberia-Pacific Ocean 2 oil pipeline. LLC Stroygazkolsalting
- The film is about compressor stations, which are being built by Stroygazconsulting.