Gusinoozerskaya state district power station

Gusinoozerskaya GRES is a thermal power station ( GRES ) located in the Zagustayskaya Valley in the city of Gusinoozersk , on the shores of Lake Gusinoye , Republic of Buryatia . Member of Inter RAO Group since 2012 . It is a subject of the wholesale electricity and capacity market .

Gusinoozerskaya state district power station
Gusinoozerskaya state district power station on Gusinom lake.JPG
A country Russia
LocationBuryatia
Gusinoozersk
Water sourceGoose lake
OwnerInter RAO
Statusacting
Commissioning1976
Main characteristics
Electric power, MW1190 MW
Thermal power224.5 Gcal / h
Equipment specifications
Primary fuelbrown coal
Reserve fuelfuel oil
Boiler units4xBKZ-640-140-PT1
2xTPE-215
Number of power units6
Number and brand of turbines1xK-200-130-3
3xK-210-130-3
2xK-215-130-1
On the map

Content

Description

Gusinoozerskaya state district power station is the largest condensing power station in Transbaikalia and one of the largest enterprises of the Republic of Buryatia. The station provides electricity to consumers in Buryatia and neighboring regions, as well as thermal energy to the city of Gusinoozersk . [one]

The main fuel for the station is brown coal from the Okino-Klyuchevsky open pit and the Gusinoozersky deposit . The kindling fuel is fuel oil . [one]

The installed electric capacity of the station at the end of 2017 is 1190 MW [2] , the thermal capacity of the station is 224.5 Gcal / h, including the capacity of turbine units - 221 Gcal / h [1] . In 2013, the state district power station generated 4823.1 million kWh of electric energy (or 89.45% of the total generation of Buryatia), the supply of thermal energy for the same period amounted to 240.2 thousand Gcal [2] .

Since 2012, GRES has been a branch of JSC Inter RAO - Electric Power Plants, previously it was a part of JSC OGK-3 .

Chimney No. 2 reaches a height of 330 meters [3] .

History

The choice of the construction site for the new state district power station in the Buryat Autonomous Soviet Socialist Republic was made in 1965 , while the use of Tugnui coal was justified as the main fuel. This decision was agreed at the USSR State Planning Commission taking into account two comments. Firstly, it was proposed to increase the design capacity of the state district power station to 6 power units of 200 MW each. Secondly, use brown coals of the Kholboldzhinsky site of the Gusinoozersky deposit. The design assignment of a state district power station based on Gusinoozersky brown coal was developed by the Tomsk branch of the Teploelektroproekt Institute and approved by the USSR Council of Ministers on December 8, 1968 (Decree No. 1335) [4] .

 
Gusinoozersk

In 1972, the construction of a power plant was announced by the All-Union Komsomol shock building [5] .

On December 1, 1976, the first power unit was launched.

In 1981, a question arose about the quality of coal at the Kholboldzhinsky opencast at the station, and the ash content of fuel increased significantly. It was decided to reconstruct the boiler units of the first stage of the station in order to transfer them to dry slag removal [4] .

The first four power units of the station were commissioned from 1976 to 1979, the fifth - in 1988, the sixth - in 1992. In 1993-1996. reconstruction of power unit No. 2 was carried out. In 2013, technical re-equipment of power unit No. 4 was completed [1] [4] .

Since the start-up of the first power unit by July 23, 2014, the station has generated more than 140 billion kWh of electric energy [6] .

At the end of 2017, based on the results of recertification of power unit No. 1, the installed capacity of the power plant was increased from 1160 to 1190 MW [7] .

Notes

  1. ↑ 1 2 3 4 Description of the station on the official website of JSC Inter RAO - Electric Power Plants (Russian) . Date of appeal September 19, 2014.
  2. ↑ 1 2 Scheme and program for the development of the electric power industry of the Republic of Buryatia for 2015-2019. (Russian) (inaccessible link) . Official website of the Government of the Republic of Buryatia. Date of treatment September 19, 2014. Archived March 5, 2016.
  3. ↑ Industrial chimneys “PSF Energo”: design, installation, supply, construction, installation of fiberglass, reinforced concrete, metal industrial chimneys
  4. ↑ 1 2 3 General characteristics of the branch of JSC OGK-3 Gusinoozerskaya State District Power Station (Russian) (unavailable link) . Date of treatment September 19, 2014. Archived December 24, 2009.
  5. ↑ Gusinoozerskaya state district power station is 35 years old !: Society: Informpolis.
  6. ↑ Gusinoozerskaya state district power station - there are 140 billion kW⋅h! (unspecified) . Gusinoozerskaya State District Power Station official Facebook page.
  7. ↑ http://irao-generation.ru/press/news/detail.php?ID=17194

Photoreports

  • Dmitry Chistoprudov. Gusinoozerskaya State District Power Station, Republic of Buryatia (Neopr.) . LJ (August 3, 2016). Date of treatment September 10, 2016.

Links

  • Gusinoozerskaya State District Power Station official Facebook page
  • The heat supply scheme of the municipality urban settlement "City of Gusinoozersk" (Russian) (inaccessible link) . Website of the Administration of the City of Gusinoozersk municipal district (January 21, 2013). Date of treatment September 19, 2014. Archived on August 8, 2014.
Source - https://ru.wikipedia.org/w/index.php?title=Gusinoozerskaya_GRES&oldid=99328016


More articles:

  • Tsyrkun, Nina Aleksandrovna
  • Radu, Stefan
  • Armenian-Kypchak language
  • I'm Eighteen
  • Madame d'Onoy
  • It's not about that at all
  • Taimyr Bay
  • Santa Cecilia in Trastevere
  • Silber, Yitzhak
  • Kateniha

All articles

Clever Geek | 2019