TPP of the Kuznetsk Metallurgical Plant

CHP Central - an energy company in Novokuznetsk .

CHP Central
A country Russia
LocationKemerovo region
, the city ​​of Novokuznetsk ,
Utility 25
Commissioning1932 year
Main characteristics
Electric power, MW100 MW
Thermal power377 Gcal / hour for residents and 133 Gcal / hour for NKMK
Equipment specifications
Primary fuelKuznetsk coal ,
blast furnace, coke oven and natural gas
Boiler unitsSterling, LMZ,
KO-III-200, TO-3,
two PTVM-100 - (hot water)
Number and brand of turbinesR-3-29 / 11, PR-7-29, T-15-29, T-16-29, PR-30-29, PT-29 / 35-2.9 / 1.0
Number and brand of generatorsT-21-40 / 80, T-22-70 / 98 - 2pcs, TFP-36-2U3, T-2-12-2,
On the map

Central CHPP (formerly KMK CHPP, EvrazEK LLC CHPP, NKMK CHPP, Energokompleks CHPP) produces electricity for the enterprises of the industrial site of the Novokuznetsk Metallurgical Plant . Consumers of thermal energy generated by turbines of thermal power plants are also the Central and Kuibyshev districts of Novokuznetsk .

Number of employees −466 [1]

Content

  • 1 Construction History
  • 2 Owners of the enterprise
  • 3 Interesting Facts
  • 4 Guide
  • 5 See also
  • 6 notes
  • 7 References

Construction History

After a decision was made in 1930 on the construction of the Ural-Kuznetsk Combine , on August 20, 1931, construction of a thermal power station for power supply to the Kuznetsk Metallurgical Combine (KMK) was started. However, in 1930, temporary power generating units were operating [2]

  • On January 14, 1932, the first boiler was put into continuous operation;
  • January 21, four days ahead of schedule, the first turbine with a capacity of 6 thousand kW was launched;
  • On February 3, 1932, the second turbine produced the first current for testing the motor generator of the KMK blast furnace;
  • February 10, 1932 began the constant operation of the station;
  • April 1932 - start-up of the third turbine with a capacity of 24 thousand kW ;
  • On September 17, 1932, a fourth turbine with a capacity of 24 thousand kW was also delivered under industrial current. The first phase of the CHP was brought to design capacity.

In 1935, the station reached a design capacity of 108 MW .

It was the first power plant of district significance. Not only KMK and other enterprises of Stalin began to operate on its electricity, but also mines in the cities of Prokopyevsk and Osinniki , iron mines in Temirtau and Telbes, as well as an agglomeration factory in the village. Mundybash.

At that time, it was the largest CHP in the country. The equipment for this CHP was mainly supplied from Germany and France. The domestic industry did not yet produce sufficiently powerful turbines, generators and boiler units. In connection with the construction of a thermal power plant in Kuzbass, electric networks with a voltage of 35 and 110 kilovolts were built.

In September 1936, a 110 kV power line was constructed between the cities of Belovo and Prokopyevsk . With the commissioning of this 110 kV overhead line, the Kemerovo State District Power Plant and the CHP of the Kuznetsk Metallurgical Plant began to work on a common electric network.

In 1942, the cooling pool was expanded

Enterprise Owners

In 1954, the CHPP left KMK as an independent enterprise of the Kuzbassenergo energy system.

In 2002-2003 it was managed by Metallenergofinans. It was part of Evraz .

On January 1, 2013, she left Evraz and the Central TPP LLC was established.

On September 15, 2013 EVRAZ sold the CHPP to the ownership of Wholesale Electric Company for 10 thousand rubles.

In June 2014, transferred to the municipal property management committee of the city of Novokuznetsk.

Number of employees −466 [3]

The situation for 2015:

In relation to LLC Central CHP (TIN 4217148426), a petition was filed for bankruptcy [4] (bankruptcy case No. А27-11770 / 2014 [5] is considered by the Arbitration Court of the Kemerovo Region), in the framework of this case, the definition of February 10, 2015 introduced observation procedure, then by a decision of June 30, 2015, the company was declared bankrupt and a bankruptcy proceedings procedure was introduced [6] .

Since the end of 2014, the CHPP property complex was leased to another company [7] - Central Heating and Power Plant LLC (TIN 4217141332), which also accepted employees of the CHPP [8] and, on its own behalf, began to produce heat energy, which was then sold to consumers .

On June 27, 2015, the CHP property complex was returned to Tsentralnaya CHP LLC (TIN 4217148426), workers were transferred there again [9] , and the production and sale of thermal energy was resumed at this enterprise.

Interesting Facts

It is planned to transfer CHP to coal-water fuel [10]

Guide

  • Bankruptcy trustee - Sergey N. Krasnov (since September 18, 2017)

See also

  • List of thermal power plants in Russia

Notes

  1. ↑ http://www.ktpogmpr.ru/primary-organizations/zapsib/contacts.php Archived July 11, 2015 on the Wayback Machine software of Evraz ZSMK
  2. ↑ Kuznetsk Metallurgical Plant. 1934.
  3. ↑ http://ktpogmpr.ru/echo-/list/?ELEMENT_ID=2848 Archived July 2, 2015 at Wayback Machine The situation at the Central CHPP is stable / Echo of Kuzbass. 2015-1
  4. ↑ Igor Lavrenkov. Central CHP goes from bankruptcy to bankruptcy // Kommersant : newspaper. - 2014 .-- December 23 ( No. 233 ).
  5. ↑ on insolvency (bankruptcy) of organizations and citizens (neopr.) . File cabinet of arbitration cases. Date of treatment November 2, 2015.
  6. ↑ Larisa Sergeeva. "Central CHP" in Novokuznetsk declared bankrupt (neopr.) . New Kuzbass (July 1, 2015). Date of treatment November 2, 2015.
  7. ↑ The property of the Novokuznetsk CHP bankrupt will be transferred to another legal entity so as not to disrupt the heating season (unopened) . Interfax-Siberia (October 9, 2014). Date of treatment November 2, 2015.
  8. ↑ Central CHP: will there be no indexation? (unspecified) . City of News (2014-12-95). Date of treatment November 2, 2015.
  9. ↑ Sergey Babikov. Central Heating and Power Plant LLC ceases to exist (neopr.) . KuzPress (June 26, 2015). Date of treatment November 2, 2015.
  10. ↑ City administration site

Links

  • Site of OJSC Kuzbassenergo
  • NKMK website
  • The history of the creation, development and construction of the Kuznetsk Metallurgical Plant
  • KMK CHPP on the site of the Novokuznetsk Archive
  • Official site of LLC Central CHP
  • KMK CHPP on the site of housing and communal services Novokuznetsk


Source - https://ru.wikipedia.org/w/index.php?title=TEC_Kuznetsk Metallurgical Plant&oldid = 100471262


More articles:

  • Pervomaiskoe (Lipetsk Region)
  • Bertone, Nuccio
  • Red Armyman (postage stamp)
  • Suffering
  • Mutter, Anne-Sophie
  • Josephites
  • Neutenia
  • Budberg, Alexander Andreevich
  • Aircraft District (Kazan)
  • Coesit

All articles

Clever Geek | 2019