Oktyabrsky bridge is a car-pedestrian reinforced concrete bridge in the city of Vologda across the river of the same name . Connects the streets of Chernyshevsky and Sergey Orlov . Built in 1928-1931 according to the project of Professor G.P. Perederii . The bridge consists of three spans, the middle span is navigable (arched).
October bridge | |
---|---|
![]() | |
Application area | car and pedestrian |
Crosses | Vologda river |
Design | |
Type of construction | Arched span |
Material | reinforced concrete |
Main span | 36.4 m |
total length | 103.3 m |
Bridge width | G-10.4 + 2x1.65 m |
Maximum load | settlement A-11, NK-80 |
Exploitation | |
Opening | March 18, 1931 |
The construction manager was engineer Aleksey Gakkel, and the foreman was engineer B.A. Zabrodin. Also, stonecutters S. S. Gusev and his sons V. S. Gusev and N. S. Gusev participated in the construction. The stone for facing the bridge was prepared by builders in the Kharovsky district of the Vologda region . The formwork of the bridge for reinforced concrete work was carried out by a team of carpenters under the guidance of master A. Zabavin.
For traffic, the bridge was opened March 18, 1931 [1] .