This is a list of St. Petersburg metro stations - a system of metro lines in St. Petersburg ( Russia ).
The first line of the Leningrad Metro was opened on November 15, 1955 and included 7 stations. Currently, the metro consists of 5 active lines, including 69 stations.
Below is a list of St. Petersburg metro stations with links to lines. For each station, the current and former names, opening date, closing date (if closed), type of station, its depth [1] and coordinates, as well as a photograph are indicated. Information on the stations planned for opening by Frunzensko-Primorskaya , Nevsko-Vasileostrovskaya and other lines is available in the stations under construction and planned .
Existing stations
| Station name | opening date | Station type | Depth (m) | Coordinates | A district of the city | Station view | |||
|---|---|---|---|---|---|---|---|---|---|
| Devyatkino until July 1, 1992 "Komsomolskaya" | December 29, 1978 | indoor ground | 0 | Vsevolozhsk district of the Leningrad region | |||||
| Civil Prospect | December 29, 1978 | columned | 64 | Kalinin district | |||||
| Academic | December 31, 1975 | columned | 64 | Kalinin district | |||||
| Polytechnic | December 31, 1975 | single vaulted | 65 | Kalinin district | |||||
| Courage Square | December 31, 1975 | single vaulted | 67 | Kalinin district | |||||
| Forest | April 22, 1975 | columned | 64 | Vyborgsky district | |||||
| Vyborg | April 22, 1975 | columned | 67 | Vyborgsky district | |||||
| Lenin Square | June 1, 1958 | pylon with a shortened central hall | 71 | Kalinin district | |||||
| Chernyshevskaya | September 1, 1958 | pylon with a shortened central hall | 70 | central District | |||||
| Uprising Square | November 15, 1955 | pylon | 58 | central District | |||||
| Vladimirskaya | November 15, 1955 | pylon with a shortened central hall | 55 | central District | |||||
| Pushkinskaya | April 30, 1956 | pylon | 57 | Admiralteysky District | |||||
| Institute of Technology | November 15, 1955 | columned | 60 | Admiralteysky District | |||||
| Baltic | November 15, 1955 | columned | 57 | Admiralteysky District | |||||
| Narva | November 15, 1955 | pylon | 52 | Kirovsky district | |||||
| Kirov factory | November 15, 1955 | columned | 50 | Kirovsky district | |||||
| Avtovo | November 15, 1955 | three-span pillar shallow | 12 | Kirovsky district | |||||
| Leninsky Prospekt | September 29, 1977 | three-span pillar shallow | eight | Kirovsky district | |||||
| Veteran Avenue | September 29, 1977 | three-span pillar shallow | eight | Kirovsky district | |||||
| Parnassus | December 22, 2006 | indoor ground | 0 | Vyborgsky district | |||||
| Prospect Education | August 19, 1988 | column wall | 65 | Vyborgsky district | |||||
| Lakes | August 19, 1988 | single vaulted | 59 | Vyborgsky district | |||||
| Specific | November 4, 1982 | single vaulted | 64 | Vyborgsky district | |||||
| Pioneer | November 4, 1982 | single vaulted | 67 | Primorsky district | |||||
| Black River | November 4, 1982 | single vaulted | 67 | Primorsky district | |||||
| Petrogradskaya | July 1, 1963 | closed type | 53 | Petrogradsky district | |||||
| Gorkovskaya | July 1, 1963 | pylon with a shortened central hall | 53 | Petrogradsky district | |||||
| Nevsky Avenue | July 1, 1963 | pylon | 63 | central District | |||||
| Hay Square until July 1, 1992 "Peace Square" | July 1, 1963 | pylon | 55 | Admiralteysky District | |||||
| Institute of Technology | April 11, 1961 | pylon | 60 | Admiralteysky District | |||||
| Frunze | April 29, 1961 | pylon with a shortened central hall | 39 | Admiralteysky District | |||||
| Moscow gate | April 29, 1961 | pylon with a shortened central hall | 35 | Moscow region | |||||
| Power | April 29, 1961 | pylon with a shortened central hall | 35 | Moscow region | |||||
| Victory Park | April 29, 1961 | closed type | 35 | Moscow region | |||||
| Moscow | December 25, 1969 | closed type | 29th | Moscow region | |||||
| Star | December 25, 1972 | closed type | 22 | Moscow region | |||||
| Kupchino | December 25, 1972 | indoor ground | 0 | Moscow region | |||||
| Jogging | May 26, 2018 | shallow pillar multi-span | 17 | Primorsky district | |||||
| Novokrestovskaya | May 26, 2018 | shallow pillar multi-span | 17 | Petrogradsky district | |||||
| Seaside | September 28, 1979 | column wall | 68 | Vasileostrovsky district | |||||
| Vasileostrovskaya | November 3, 1967 | closed type | 64 | Vasileostrovsky district | |||||
| Gostiny Dvor | November 3, 1967 | closed type | 56 | central District | |||||
| Mayakovskaya | November 3, 1967 | closed type | 51 | central District | |||||
| Alexander Nevsky Square | November 3, 1967 | closed type | 54 | central District | |||||
| Elizarovskaya | December 21, 1970 | closed type | 62 | Nevsky district | |||||
| Lomonosovskaya | December 21, 1970 | closed type | 65 | Nevsky District | |||||
| Proletarian | July 10, 1981 | columned | 72 | Nevsky District | |||||
| Obukhovo | July 10, 1981 | single vaulted | 62 | Nevsky District | |||||
| Fishing | December 28, 1984 | indoor ground | 0 | Nevsky district | |||||
| Spasskaya | March 7, 2009 | pylon | 60 | Admiralteysky District | |||||
| Dostoevskaya | December 30, 1991 | columned | 62 | central District | |||||
| ligovsky Avenue | December 30, 1991 | single vaulted | 66 | central District | |||||
| Alexander Nevsky Square | December 30, 1985 | columned | 60 | central District | |||||
| Novocherkasskaya until July 1, 1992 Krasnogvardeiskaya | December 30, 1985 | single vaulted | 61 | Krasnogvardeisky district | |||||
| Ladoga | December 30, 1985 | single vaulted | 61 | Krasnogvardeisky district | |||||
| Prospect Bolsheviks | December 30, 1985 | single vaulted | 68 | Nevsky District | |||||
| Dybenko street | October 1, 1987 | column wall | 61 | Nevsky district | |||||
| Commandant Avenue | April 2, 2005 | column wall | 75 | Primorsky district | |||||
| Old village | January 14, 1999 | single vaulted | 61 | Primorsky district | |||||
| Krestovsky island | September 3, 1999 | column wall | 49 | Petrogradsky district | |||||
| Chkalovskaya | September 15, 1997 | single vaulted | 60 | Petrogradsky district | |||||
| Sports | September 15, 1997 | single-vault interchange bunk | 64 | Petrogradsky district | |||||
| Admiralteyskaya | December 28, 2011 | column wall | 86 | central District | |||||
| Garden | December 30, 1991 | single vaulted | 71 | Admiralteysky District | |||||
| Zvenigorod | December 20, 2008 | column wall | 57 | Admiralteysky District | |||||
| Bypass channel | December 30, 2010 | pylon | 61 | Frunze district | |||||
| Volkovskaya | December 20, 2008 | pylon | 61 | Frunze district | |||||
| Bucharest | December 28, 2012 | pylon | 65 | Frunze district | |||||
| International | December 28, 2012 | column wall | 65 | Frunze district |
Station Under
| Station name | opening date | Previous design names | Change at the time of delivery | Location | Area |
|---|---|---|---|---|---|
Right Bank Line | |||||
| Theatrical | 2023 | theatre square | not | theatre square | Admiralteysky |
| Mining Institute | 2022 | Oblique line, Bolshoi Avenue | not | Oblique line, Bolshoi Avenue | Vasileostrovsky |
Frunze-Primorsky line | |||||
| Prospect of Glory | 2019 [2] | not | Glory Avenue, Bucharest Street, South Highway | Frunze | |
| Danube | 2019 [2] | Danube Avenue | not | Bucharest street, Danube avenue, Yaroslav Gashek street | Frunze |
| Shushary | 2019 [2] | South | not | Avtozavodsky passage | Pushkinsky |
Krasnoselsko-Kalinin line | |||||
| Putilovskaya | 2022 [3] [4] [5] | Kirov Plant-2 | Kirov factory | Vasya Alekseeva street | Kirovsky |
| Southwest | 2022 [3] [4] [5] | Marshal Kazakov Street, Kazakovskaya | not | Marshal Zhukov Avenue, Marshal Kazakov Street | Kirovsky , Krasnoselsky |
Designed stations
List of stations, the opening of which is planned before 2030 [6] .
| Station name | Start of construction | opening date | Previous design names | Change at the time of delivery | Area |
|---|---|---|---|---|---|
Kirov-Vyborg line | |||||
| Alexandrino | 2023-2028 | Kirovsky | |||
| Marshal Zhukov Avenue | 2023-2028 | Kirovsky | |||
Nevsko-Vasileostrovskaya line | |||||
| Tourist | is unknown | 2025 | Yacht | not | Seaside |
| Glider | is unknown | 2025 | Zoo | Shuvalovsky Avenue | Seaside |
Frunze-Primorsky line | |||||
| Shuvalovsky Avenue | is unknown | 2025 | Highway No. 30, Shavrova Street, Nizhne-Kamenskaya, Shuvalovskaya | Glider | Seaside |
Krasnoselsko-Kalinin line | |||||
| Carriage | is unknown | 2026 - 2027 | Bypass channel-2 | Bypass channel | Frunze |
| Borovaya | is unknown | 2026 - 2027 | Vitebsky Avenue; railway station Borovaya | not | Frunze , Moscow |
| Zastavskaya | is unknown | 2026 - 2027 | Moscow Gate-2, Chernihiv | Moscow gate | Moscow |
| Armored | is unknown | 2026 - 2027 | Gracious street; Railway station Bronevaya | not | Moscow |
Closed, as well as completed and closed stations
| Closed | ||||
|---|---|---|---|---|
| Line | Station name | opening date | closing date | Cause |
| Kirovsk-Vyborg | Country | June 1, 1966 | October 5, 1977 | the station was originally built as a temporary |
| Opened on the current site | ||||
| Line | Station name | Site opening date | Station Opening Date | Cause |
| Kirovsk-Vyborg | Pushkinskaya | November 15, 1955 | April 30, 1956 | problems with the construction of the ramp |
| Kirovsk-Vyborg | Chernyshevskaya | June 1, 1958 | September 1, 1958 | |
| Moscow-Petrograd | Star , Kupchino | December 12, 1972 | December 25, 1972 | earlier commissioning of the electric depot "Moscow" |
| Frunze-Primorsky | Admiralteyskaya | September 15, 1997 | December 28, 2011 | problems with the construction of the ramp |
| Frunze-Primorsky | Krestovsky island | January 14, 1999 | September 3, 1999 | delays in building the ground lobby |
| Moscow-Petrograd | Parnassus | February 1, 2000 | December 22, 2006 | earlier commissioning of the Vyborgskoye electric depot, fully built on the existing stage |
| Frunze-Primorsky | Bypass channel | December 20, 2008 | December 30, 2010 | problems with the construction of the ramp |
| Temporarily closed | ||||
| Line | Station name | closing date | opening date | Cause |
| Nevsko-Vasileostrovskaya | Fishing | May 1, 2000 | April 1, 2001 | repairs |
| Nevsko-Vasileostrovskaya | Proletarian | August 25, 2005 | November 17, 2006 | slope waterproofing repair |
| Moscow-Petrograd | Gorkovskaya | October 11, 2008 | December 26, 2009 | slope waterproofing repair |
| Moscow-Petrograd | Petrogradskaya | January 5, 2013 | November 15, 2013 | slope waterproofing repair |
| Right Bank | ligovsky Avenue | January 5, 2014 | November 30, 2014 | upsetting of the lobby building, problems with the waterproofing of the inclined course |
| Kirovsk-Vyborg | Vyborg | February 7, 2015 | December 25, 2015 | slope waterproofing repair |
| Nevsko-Vasileostrovskaya | Vasileostrovskaya | July 11, 2015 | May 27, 2016 | slope waterproofing repair |
| Nevsko-Vasileostrovskaya | Elizarovskaya | February 8, 2016 | December 29, 2016 [7] | slope waterproofing repair |
| Kirovsk-Vyborg | Forest [7] [8] | January 28, 2017 | December 23, 2017 | slope waterproofing repair |
| Kirov-Vybrog | Academic [9] | July 30, 2018 | July 1, 2019 | repair of the lobby and slope waterproofing |
Interchange nodes
Below is a list of existing interchange hubs of the St. Petersburg metro.
Technological Institute ( cross-platform transplant )
Vladimirskaya ↔ Dostoevskaya
“ Uprising Square ” ↔ “ Mayakovskaya ”
“ Sennaya Square ” ↔ “ Spasskaya ” ↔ “ Sadovaya ”
Nevsky Prospect ↔ Gostiny Dvor
“ Alexander Nevsky Square-I ↔ Александра Alexander Nevsky Square-II ”
Pushkinskaya ↔ Zvenigorodskaya
Notes
- ↑ Indicated value is approximate.
- ↑ 1 2 3 The opening of new stations of the Frunze metro radius was postponed to 2019 - News by Kupchino . kupchinonews.ru. Date of appeal October 23, 2018.
- ↑ 1 2 A tender has been announced for the construction of the Krasnoselsko-Kalinin metro line . Administration of St. Petersburg (November 23, 2015). Date of treatment December 19, 2015.
- ↑ 1 2 The winner is determined for the construction of the first stage of the Krasnoselsko-Kalinin metro line . Committee for the development of transport infrastructure of St. Petersburg. Date of treatment December 19, 2015.
- ↑ 1 2 Decree N 552 No. "On the state program of St. Petersburg" Development of the transport system of St. Petersburg "for 2015-2020 . Government of St. Petersburg (August 13, 2015). Date of treatment December 21, 2015.
- ↑ The official website of the St. Petersburg metro. Prospects for the development of the subway. The development plan of the metro in St. Petersburg for 2011-2015 with a perspective until 2025
- ↑ 1 2 Petersburg diary. Release from 09/12/2016. "Elizarovskaya" will open in December with a new panel
- ↑ “Academic” will be closed for overhaul
- ↑ "Academic" is closed for repairs on July 30 - the Administration of St. Petersburg . www.gov.spb.ru. Date of treatment June 18, 2018.