Krasnoyarsk state district power station-2

Krasnoyarsk State District Power Station-2 is a thermal power station in the city of Zelenogorsk, Krasnoyarsk Territory , on the Kan River, and is part of OGK-2 PJSC.

Krasnoyarsk state district power station-2
Krasnoyarskaya GRES-2.jpg
A country Russia
LocationZelenogorsk, Krasnoyarsk Territory
OwnerPJSC OGK-2
Statusacting
Commissioning1961
Main characteristics
Electric power, MW1260 MW [1]
Thermal power976 Gcal / h [1]
Equipment specifications
Primary fuelBrown coal , fuel oil
Boiler unitsPK-38
PK-14
BKZ-420-140
Number and brand of turbinesK-160-130
PT-60-90 / 13
PT-135 / 165-130 / 15
Number and brand of generatorsTV2-150-2 - 3 pcs.
TVF-60-2 - 1 pc.
TVV-165-2U3 - 2 pcs.
TVV-160-2U3 - 3 pcs.
other information
Sitewww.ogk2.ru
On the map

The installed electric capacity of the state district power station is 1260 MW, the installed heat capacity is 976 Gcal / h. Dry and liquid slag boilers. Coals of the Borodino and Kansky coal mines of the Kansk-Achinsky coal basin are burned. The annual amount of ash and slag waste is about 220 thousand tons. The main fuel of the station is coal, the reserve fuel is fuel oil.

Content

Thermal and electrical energy generation

Performance indicators in 2009-2017 [2]
200920102011201220132014201520162017
Power generation
million kWh
5 0195,8605,8966,7744,6494 3465,9304,7585 203
Heat energy production
thousand Gcal
1,2601,2631,0891,06799010149631,024948
KIUM,
%
465454614240544347

Creation History

  • 1955 year. On November 14, the USSR Council of Ministers decided to build an enterprise for the production of weapons-grade uranium (now - OJSC “Production Association“ Electrochemical Plant ”” ) and a thermal power station at a site located northwest of the Zaozernaya station of the East Siberian Railway, in the area of ​​settlements of Ust -Barga, Ilyinka, Lebedevka of the Krasnoyarsk Territory. The cogeneration plant was designated as CHP No. 766 [3] .
  • 1957 year. Work has begun at the CHP site to plan and prepare the territory for the construction of a power plant. In order to accelerate the construction, it was decided to use turbine units with a capacity of 150 MW instead of design units, but not ready for production, with a capacity of 200 MW.
  • 1958, August 21. Fedor Pavranovich Baran was appointed director of the TPP No. 766 under construction [3] .
  • 1960 year, autumn. The course of the Kan River was blocked for the construction of a hydroelectric complex.
  • 1961, July 10. At 1 hour 30 minutes the first power unit of the power plant was launched. The first inclusion of the unit in the power system was performed by Evgeny Andrianovich Pechenkin, senior station engineer on duty.
  • 1961-1964 years. Power units No. 1, 2, 3, 4, 5 were commissioned as part of the first stage of the power plant.
  • 1967, April 29. For the first time, a voltage was applied to the 500 kV Kamala-1 substation via a power line.
  • 1974-1976 year. Power units No. 6, 7, 8 were commissioned as part of the second stage of the power plant.
  • 1981-1983 Power units No. 9, 10 were commissioned as part of the third stage of the power station [4] .

List of main equipment

UnitType ofManufactureramountCommissioningMain characteristicsSources
ParameterValue
Equipment for steam turbine plants of the first stage (power units 1–5)
Steam boilerPK-38ZiO-Podolsk61961-1963Fuelcoal , fuel oil[one]
Performance270 t / h
Steam parameters140 kgf / cm 2 , 545 ° С
Steam boilerPK-14ZiO-Podolsk21964Fuelcoal , fuel oil[one]
Performance170 t / h
Steam parameters140 kgf / cm2.520 ° С
Steam turbineK-160-130-2PR1Kharkov Turbogenerator Plant31961-1963Installed capacity150 mw[one]
Thermal load45 Gcal / h
Steam parameters- kgf / cm 2 , - ° С
Steam turbinePT-60-90 / 13Leningrad Metal Plantone1964Installed capacity50 MW[one]
Thermal load145 Gcal / h
Steam parameters- kgf / cm 2 , - ° С
Equipment for steam turbine plants of the second stage (power units 6–8)
Steam boilerPK-38ZiO-Podolsk61974-1976Fuelcoal , fuel oil[one]
Performance270 t / h
Steam parameters140 kgf / cm 2 , 545 ° С
Steam turbineK-160-130-2Kharkov Turbogenerator Plant31974-1986Installed capacity160-164 MW[one]
Thermal load42 Gcal / h
Steam parameters- kgf / cm 2 , - ° С
The equipment of steam turbine plants of the third stage (power units 9-10)
Steam boilerBKZ-420-140PTBarnaul boiler plantfour1981-1987Fuelcoal , fuel oil[one]
Performance420 t / h
Steam parameters140 kgf / cm 2 , 560 ° С
Steam turbinePT-135 / 165-130-15Ural Turbomotor Plant21981-1983Installed capacity136 MW[one]
Thermal load285 Gcal / h
Steam parameters- kgf / cm 2 , - ° С

See also

  • List of thermal power plants in Russia (installed capacity of more than 25 MW)

Notes

  1. ↑ 1 2 3 4 5 6 7 8 9 10 Annual Report of PJSC OGK-2 for 2017 (neopr.) . PJSC OGK-2 . Date of treatment November 4, 2018.
  2. ↑ Electricity production
  3. ↑ 1 2 V.R.Saveliev. Secrets of the green mountains. Book 4. - Krasnoyarsk: Letter. - S. 6. - 160 p. - 300 copies.
  4. ↑ History of creation (neopr.) . PJSC OGK-2 . Date of treatment November 4, 2018.


Source - https://ru.wikipedia.org/w/index.php?title=Krasnoyarskaya_GRES-2&oldid=96124061


More articles:

  • Ram-Zet
  • Intelligent Design
  • Pauling Linus
  • Pre-emptive Signs
  • Republican Party of Albania
  • Berlin, Abram Leibovich
  • Prospect Kirova (Saratov)
  • The Arrow
  • Republika Srpska Krajina
  • Ecclesiastes Book

All articles

Clever Geek | 2019